Laserfiche WebLink
Status: Complied with. All of the permits listed above have been submitted and the stipulation <br />has been satisfied. <br />STIPULATIONNO.2 <br />PRIOR TO CONSTRUCTION OF POND 11, SENECA COAL COMPANY MUST SUBMIT ADDITIONAL <br />RECLAMATION PERFORMANCE BOND TO THE DIVISION. THE BOND AMOUNT MUST BE APPROVED BY THE <br />DIVISION. <br />Status: Complied with 01118196. Stipulation No. 2 has been satisfied by submittal of TR-02. <br />STIPULATION NO. 3 <br />PRIOR TO CONSTRUCTION OF TOPSOIL PILE F, SENECA COAL COMPANY MUST SUBMIT ADDITIONAL <br />RECLAMATION PERFORMANCE BOND TO THE DIVISION. THE BOND AMOUNT MUST BE APPROVED BY THE <br />DIVISION. <br />Status: Complied with 10121197. Stipulation No. 3 was satisfied by the submittal of MR-11, <br />which eliminated Topsoil Pile H and transferred the bonding liability associated with Pile H to <br />Pile F. <br />STIPULATION NO. 4 <br />PRIOR TO RETENTION OF THE YOAST HAUL ROAD AS PART OF THE POST MINING LAND USE, A SIGNED <br />CONSENT FORM FROM MANEOTIS SHEEP COMPANY MUST BE SUBMITTED TO THE DIVISION. <br />Status: Complied with. Stipulation No. 4 has been satisfied by the submittal of a signed consent <br />form dated 05108196, now contained within the permit document. <br />STIPULATION NO. 5 <br />WITHIN 180 DAYS OF PERMIT ISSUANCE AND PRIOR TO CONSTRUCTION OF POND 11, THE APPLICANT <br />SHALL SUBMIT A TECHNICAL REVISION TO THE YOAST PERMIT WHICH DEMONSTRATES THAT POND 11 <br />WILL BE LOCATED AS NEAR AS PRACTICABLE TO THE DISTURBED AREA, AND THAT THE POND <br />EMBANKMENT HAS A MINIMUM STATIC SAFETY FACTOR OF 1.3. <br />Status: Complied with 07128197. Stipulation No. 5 has been satisfied, the location acceptance <br />documented in a letter dated 03103197 and the static safetyfactor satisfied by approval of TR-06 <br />STIPULATION NO. 6 <br />WITHIN SIXTY DAYS OF PERMIT ISSUANCE, THE APPLICANT SHALL SUBMIT A TECHNICAL REVISION TO THE <br />YOAST PERMIT ADDING A SURFACE WATER MONITORING STATION TO GRASSY CREEK DOWNSTREAM FROM <br />THE CONFLUENCE OF GRASSY CREEK AND SCOTCHMANS GULCH. THE REVISION SHALL ALSO ADDRESS <br />MONITORING FREQUENCYAND PARAMETERS TO BE MONITORED. <br />Yoast Mine 3 December 15, 2010