Laserfiche WebLink
• • <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />June 2009 CQA Field Staff Schedule for AMEC Personnel <br />is <br />ameO <br />Name 6/1 6/2 6/3 6/4 6/5 6/6 6/7 6/8 619 6/10 6111 6/12 6/13 16/14 6/17 6/18 6/19 6120 6/21 6/22 6/23 6/24 <br />6124 6/25 <br />6/21 6/26 6127 6/28 <br />28 6/29 6/30 <br />Jose h Hickey PR PR PR PR PR - PR PR PR PR PR PR PR PR PR <br />Steve Rice LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS <br />LS LS <br />T ler Wendlandt ST ST ST ST ST ST ST ST ST ST ST 1 ST ST ST ST <br />K <br />ST ST ST <br />ST ST <br />ST ST <br />ST ST <br />ST <br />Chris McCabe LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT <br />LT LT <br />LT <br />SteMar uez *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST ST ST <br />John Lu o PCE <br />Derek Wittwer PM PM PM <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/ Laboratory Manager <br />SE = Senior Engineer <br />Page 1 of 1