Laserfiche WebLink
• • • <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />November 2010 CQA Field Staff Schedule for AMEC Personnel <br />Name 1111 11/2 11/3 11/4 <br />Joseph Hickey PR PR PR PR <br />Ben amin Melly LG LG LG LG <br />Craig Thompson LS LS LS LS <br />Eric Nar an GT GT GT GT <br />Jeremy Laub GT GT GT GT <br />Bill Erickson ST ST ST ST <br />Uwe Kelley ST ST ST ST <br />Reggie Lon ST ST ST ST <br />Jennifer Markham ST ST ST ST <br />Gratton Miller ST ST ST ST <br />Madison Crouch LT LT LT LT <br />John Lupo <br />Derek Wittwer <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR= Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/ Laboratory Manager <br />SE = Senior Engineer <br />Page 1 of 1 <br />ameO