My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (173)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (173)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/16/2010 12:12:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA monitoring and Test Results- 2010, VOL. II, Appendix C, Staff Schedule
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />June 2010 CQA Field Staff Schedule for AMEC Personnel <br />• <br />ameO <br />Name 6/1 6/2 6/3 6/4 6/5 6/6 6/7 6/8 6/9 6/10 6/11 6/12 6/13 6/14 6/15 6/16 6/17 6/18 6/19 6/20 6/21 6/22 6/23 6/24 6/25 6/26 6/27 6/28 6/29 6/30 <br />Joseph Hicke PR PR PR PR PR PR PR PR PR PR PR - - PR PR PR PR PR PR - PR PR PR PR PR PR PR <br />Steve Rice <br />j LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS <br />Ben <br />amin Mell LG LG LG LG LG LG LG LG LG LG LG LG LG LG LG LG LG LG LG LG LG LG LG LG LG LG LG <br />Alfonso Frias GT GT GT GT GT GT GT GT GT GT GT GT - GT GT GT GT GT GT GT GT GT GT GT GT GT <br />Craig Thompson GT GT GT GT GT GT GT ST ST ST ST ST GT GT ST ST ST ST ST GT F ST ST ST GT GT GT <br /> <br />Ker Law <br />GT <br />GT <br />GT <br />GT <br />GT <br /> <br />GT <br /> <br />GT <br /> <br />GT <br /> <br />GT <br /> <br />GT <br /> <br />GT <br /> <br />GT <br /> <br />GT <br /> <br />GT <br /> <br />GT <br /> <br />GT <br /> <br />GT <br /> <br />GT <br /> <br />GT G <br /> <br />GT <br /> <br />G <br /> <br />GT <br /> <br />GT <br /> <br />GT <br /> <br />GT <br />Eric Nar an GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT <br />Bill Erickson ST ST ST ST ST ST ST GT GT GT GT GT ST GT GT GT GT GT ST GT GT GT ST GT GT <br />Amanda Dolezal ST ST ST ST ST ST <br />Jeremy Laub <br />Michael Stewart ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST <br /> ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST <br />Uwe Kelle <br />Collin Emmerson ST ST ST ST ST ST ST ST <br /> <br />Rand Johnson *ST *ST *ST *ST *ST *ST *ST *ST <br /> <br />Mark Casazza <br />ST <br />ST *ST *ST *ST *ST *ST *ST *ST *ST <br />Madison Crouch LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT <br />John Lu o <br />Derek Wittwer PM PM - PM - - <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/ Laboratory Manager <br />SE = Senior Engineer <br />Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.