Laserfiche WebLink
• • <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />April 2010 CQA Field Staff Schedule for AMEC Personnel <br />• <br />ameO <br />Name 4/1 4/2 4/3 4/4 4/5 4/6 417 4/8 4/9 4/10 4/11 4/12 4/13 4/14 4/15 4/16 4/17 4/18 4/19 4/20 4/21 4/22 4/23 4/24 4/25 4/26 4/27 4/28 4/29 4/30 <br />Joseph Hickey PR PR - PR PR PR PR PR PR PR - - PR PR PR PR PR PR PR PR PR <br />Steve Rice LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS <br />Mike Glass LG LG LG LG LG LG LG LG LG LG LG LG LG LG <br />Alfonso Frias ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST <br />Tyler Wendlandt *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST ST ST ST ST ST ST ST ST ST ST <br />Bill Erickson <br />j *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST *ST <br />Ben <br />amin Melly <br />Craig Thompson GT GT GT GT GT GT GT GT GT <br />GT GT <br />GT GT <br />GT GT <br />GT GT <br />GT <br />GT GT <br />GT GT <br />GT GT <br />GT GT <br />GT GT <br />GT GT <br />GT GT <br />GT GT <br />GT GT <br />GT GT <br />GT <br />Madison Crouch LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT <br />Brian Nelson LT LT LT LT <br />John Lupo PCE PCE <br />Derek Wittwer PM PM <br />Ja Moore <br />SE <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/ Laboratory Manager <br />SE = Senior Engineer <br />Page 1 of 1