Laserfiche WebLink
• <br />• <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Photograph Log <br />amec,40 <br />Photo <br />Number Date Description <br />1 February 4, 2009 Ames Relocating Existing Topsoil Inside the VLF Area <br />2 February 6, 2009 Drillin in Sediment Collection Pond to Delineate Extent of Mine Workings <br />3 February 26, 2009 Clay Processing Plant, Located at Dump 5 <br />4 March 24, 2009 Clay Transport to South Cresson Clay Stockpile <br />5 Aril 24, 2009 Re-locating Clay Plant to the South Cresson Clay Processing <br />6 Aril 29, 2009 Structural Fill Placement <br />7 May 6, 2009 Sediment Pond - Completing Sub grade <br />8 May 27, 2009 Sub grade Preparation West of the East Perimeter Road <br />9 May 30, 2009 Structural Fill placement near station A18+00 +/- <br />10 June 10, 2009 Compaction of Soil Liner Fill at the Sediment Pond <br />11 June 30, 2009 Structural Fill Placement within the Phase 5 VLF <br />12 Jul 20, 2009 Structural Fill Placement Near Station A22+00 +/- <br />13 Jul 23, 2009 Cemented Rock Fill Placement for Underground Working #3004 <br />14 August 7, 2009 Stripping Vegetation Near Station J18+00 +/ <br />15 August 10, 2009 Structural fill placement near A39+00 +/- <br />16 August 16, 2009 Structural fill placement near F9+00 +/ <br />17 August 24, 2009 Slope Contouring West Facing Slope of Phase 5 VLF <br />18 September 1, 2009 Sub grade Preparation Near Stations A46+00 +/ <br />19 September 10, 2009 Removal of Old Phase IV Solution Lines <br />20 September 15, 2009 AMEC Performing a Large Rock Gradation for Placed Structural <br />21 October 1, 2009 Processing Soil Liner Fill <br />22 October 19, 2009 Removal of the 84" Culvert near Stations D1+00 +/- <br />23 November 18, 2009 Remediation of Underground Working 3008, (Thompson Shaft <br />24 November 19, 2009 Prima Underdrain Excavation <br />25 January 25, 2010 Structural Fill Placement Along South Toe Berm Near Station C2+50 <br />26 January 27, 2010 Clearing and Grubbing at the East Cresson Clay Borrow <br />27 February 17, 2010 Prima Underdrain Construction <br />28 March 26, 2010 Concrete Plug Placement at UG#3012 <br />29 Aril 7, 2010 Unloading Geomembrane On-site <br />30 May 15, 2010 Slope Contouring Near Station A24+00 +/- <br />31 May 17, 2010 Geomembrane (Secondary) Near Station F0+50 +/ <br />32 May 21, 2010 PSSA Ore Slope Construction Near Station G2+00 +/- <br />33 May 26, 2010 Moisture Conditioning/Processing In-place SLF <br />34 June 5, 2010 Overall Sloe Contouring Progress <br />35 June 16, 2010 Topsoil Placement at the South Toe Berm <br />36 June 18, 2010 LVSCF Placement <br />37 June 22, 2010 Geomembrane Vacuum Testing <br />38 June 28, 2010 Geomembrane Repair Activities <br />39 Jul 6, 2010 Finishing the LVSCF Surface <br />40 Jul 13, 2010 Backfillin the PSSA Anchor Trench <br />41 Jul 30, 2010 Geomembrane As-Built Survey <br />42 August 13, 2010 DCF Placement Overview <br />43 August 17, 2010 DCF Placement <br />44 August 21, 2010 SLF Placement <br />45 August 22, 2010 Destructive Testing <br />46 August 23, 2010 Structural Fill Placement for Lime Road Sliver Fill <br />47 August 29, 2010 Geomembrane Repair Activities <br />48 September 8, 2010 Low Volume Solution Collection Riser Construction <br />49 September 9, 2010 Moisture Conditioning SLF <br />50 September 20, 2010 High Volume Solution Collection Riser Base Installation <br />51 September 28, 2010 Hi h Volume Solution Collection Manifold Placement <br />52 October 7, 2010 Elevated High Volume Soluction Collection Piping Installation <br />53 October 9, 2010 Backfillin the High Volume Solution Collection Risers <br />54 October 11, 2010 DCF Placement & Geomembrane Deployment <br />55 October 14, 2010 Geomembrane Deployment last 100 mil PSSA panel) <br />56 October 22, 2010 As-built Survey of the High Volume Solution Collection System <br />57 October 24, 2010 !High Volume Solution Collection System Installation <br />58 October 29,2010 Drain Cover Fill Placement <br />Page 1 of 1