My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-15_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-12-15_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:56 PM
Creation date
12/16/2010 8:10:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
12/15/2010
Doc Name
Letter Regarding Comments and Responses
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR81
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Response Accepted. Colowyo has defined the South Taylor Fill Design line in the <br />legend. <br />b. Response Accepted. Colowyo has added the highwall mining zones to the map. <br />C. Response Accepted. Areas of permanent fill have been shaded on the map as <br />requested. <br />8. Map 45 - South Taylor Fill <br />a. Response Accepted. Slope rations have been added to the map as requested. <br />b. Response Accepted. An east-west cross-section line has been added to the map as <br />requested. <br />c. Anticipated and completed highwall mining lines have been added to the cross <br />sections, with explanatory notes as necessary. However, the zones are not depicted in <br />plan view, as Colowyo states. Please add zones of anticipated and completed highwall <br />mining to the Plan View. <br />d. Response Accepted. The South Taylor Pit Shell Outline line has been added to the <br />map's legend as requested. <br />e. Response Accepted. The color of the South Taylor Fill Design has been modified as <br />requested. <br />Response: The zones of anticipated and completed highwall mining have been added to the plan <br />view on Map 45. <br />Rule 3.02.2 - Determination of Bond Amount <br />9. Based on the materials provided in response to the Division's preliminary adequacy <br />review letter, the Division generally agrees with Colowyo's revised mine plan and post- <br />mining topography (pending resolution of the remaining adequacy questions). At this time, <br />Colowyo should prepare and submit a revised reclamation cost estimate for the entire mine <br />site as part of the TR-81 review. <br />Colowyo did submit an updated reclamation cost estimate with the submittal of Technical <br />Revision 85, which was deemed incomplete on 2 March 2010. The Division requests that <br />Colowyo include a revised cost estimate as a part of the Technical Revision 81 review. No <br />proposed changes will be approved without a revised reclamation cost estimate. The <br />changes proposed in Technical Revision 85 will be included in Technical Revision 81, <br />therefore the Division recommends that Colowyo withdraw Technical Revision 85. <br />Rule 4.05.4 - Stream Channel Reconstruction <br />10. Response Accepted. Colowyo has provided SEDCAD modeling and design <br />information for the permanent ditches at the East Taylor and West Taylor Fills as requested. <br />11. Response Accepted. Colowyo has extended the ditches as necessary. <br />12. Response Partially Accepted. Colowyo has provided designs information for terrace <br />ditches, which will be used in the post-mining topography in the South Taylor Pit and <br />surrounding area. The terrace ditch designs provided show a triangular or "V" ditch design. <br />The Division prefers the use of a more asymmetric terrace ditch design similar to the ones <br />used in the Colowyo 2009 East Pit and West Pit reclamation. The asymmetric ditches lend
The URL can be used to link to this page
Your browser does not support the video tag.