My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-15_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-12-15_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:56 PM
Creation date
12/16/2010 8:10:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
12/15/2010
Doc Name
Letter Regarding Comments and Responses
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR81
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
modeling for the East Taylor Pond to incorporate changes to the drainage areas and <br />ditches in the watershed that reports to the pond. <br />Response: This response will be provided upon finalization of the hydrologic design. <br />k. The post-mining topography shown on Map 41 is the currently approved post-mining <br />topography. Colowyo has not updated this map to reflect the changes proposed with <br />Technical Revision 81. Please update the post-mining topography shown on Map 41 to <br />reflect the post-mining topography proposed with Technical Revision 81. <br />Response: We have updated the postmining topography with the proposed topo "PMT TR81 <br />1110" on Map 41. <br />1. On Map 41 in the middle northern portion of Section 3 Colowyo shows a "Stoker <br />Ditch". This ditch is not shown on Map 33 or Map 33A and no designs are contained in <br />the permit for this ditch. This ditch appears to be a contour ditch that will flow into the <br />Streeter Gulch Ditch at approximately station 85+00. Please provide the Division with an <br />explanation of what this ditch is. If this ditch is proposed as a permanent, post-mining <br />channel, please proved design details, including SEDCAD modeling, and include it on <br />either Map 33 or Map 33A. Please also include station tick marks for the ditch on Map <br />41. <br />Response: The Stoker Ditch is an existing temporary structure. The design dates from 1998. <br />Design information is provided in Volume 2C, Exh. 7-148. Note that callout boxes <br />have been added to Maps 12, 12A, 41, and 41A showing the location of design <br />information for all channel designs. The temporary nature of the Stoker Ditch is now <br />clearly presented on all maps. Station tick marks have also been added. <br />38. Colowyo has proposed changes to the mining limits for the South Taylor Pit with <br />Technical Revision 81. The proposed limits have been changed on Map 23A - Mine Plan- <br />South Taylor Pit, Map 29A - Spoil Grading-South Taylor Area and Map 41A - Watershed <br />Boundaries for Hydrologic Modeling-South Taylor Area. Colowyo is proposing to eliminate <br />approximately 358 acres to the south and east of the South Taylor Pit and approximately 92 <br />acres to the west of the South Taylor Pit. Colowyo has also proposed changes to the South <br />Taylor Pit's post-mining topography. These changes will have impacts to the two ponds <br />proposed for the South Taylor Pit area, the Section 21 and Section 28 Ponds. The current <br />models for the Section 21 and Section 28 Ponds are for the approved mining limits and <br />post-mining topography, not the proposed changes to the mining limits and post-mining <br />topography. As such, these pond models are not valid for the proposed changes. Based <br />on the proposed changes to the mining limits and post-mining topography contained in <br />Technical Revision 81, please update the pond models for the Section 21 and Section 28 <br />Ponds. These revised pond models need to reflect the proposed changes to the mining <br />limits, the post-mining topography and the spoil grading plan. <br />Response: This response will be provided upon finalization of the hydrologic design. <br />39. Colowyo has made numerous changes and additions to Exhibit 7, Item 20 that have <br />not been reflected in the Table of Contents. Please review the Table of Contents for Exhibit <br />7, Item 20 and ensure that all changes and additions have been correctly incorporated. <br />Response: The Table of Contents for Exhibit 7, Item 20 has been updated with this submittal.
The URL can be used to link to this page
Your browser does not support the video tag.