My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-09_GENERAL DOCUMENTS - C1982057
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1982057
>
2010-12-09_GENERAL DOCUMENTS - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:46 PM
Creation date
12/15/2010 1:25:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
General Documents
Doc Date
12/9/2010
Doc Name
Proposed Decision & Findings of Compliance for RN5
Permit Index Doc Type
Findings
Email Name
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Decision RN-5 <br />The Colorado Division of Reclamation, Mining and Safety proposes to approve the application for <br />Permit Renewal No. 5, for the Seneca II-W Mine. <br />The application was submitted by Seneca Coal Company. This decision is based on a finding that <br />the operations will comply with all requirements of the Colorado State Program as found in the <br />Colorado Surface Coal Mining Reclamation Act, C.R.S. 34-33-101 et seq., and the Regulations <br />promulgated pursuant to the Act. If no request for a formal hearing is made within thirty (30) days of <br />the first publication of the issuance of this proposed decision, then this decision becomes final. Upon <br />submittal of acceptable surety by the applicant, the decision will become effective. The renewal <br />application, all supporting documentation and any stipulations or conditions will become a binding <br />part of the permit. <br />There are no new Stipulations attached to Permit Renewal No. 5. There is one stipulation (No. 32) <br />originally attached to the TR-42 approval decision, which remains in effect. <br />STIPULATION 32 <br />FOR PERMANENT ROAD RETENTION ON RECLAIMED LANDS, THE PERMITTEE <br />WILL SUBMIT, WITHIN A COMPLETE REVISION APPLICATION, DEMONSTRATION <br />OF COMPLIANCE WITH 4.03.1(1)(F) OR 4.03.2(1)(G) AS - APPLICABLE. THE <br />DEMONSTRATION WILL INCLUDE COPIES OF SIGNED LANDOWNER REQUESTS <br />FOR ROAD RETENTION FROM EACH AFFECTED LANDOWNER. ALL ROADS OR <br />SEGMENTS OF ROADS REQUESTED FOR RETENTION WILL BE IDENTIFIED <br />CONSISTENT WITH DESIGNATION IN THE PERMIT APPLICATION (HAUL ROAD G, <br />RIDGELINE ACCESS ROAD, OIL WELL ACCESS ROAD, ETC.) THE ROAD <br />RETENTION DEMONSTRATION WILL BE SUBMITTED TO AND APPROVED BY THE <br />DIVISION PRIOR TO APPROVAL OF PHASE 1 BOND RELEASE FOR ANY <br />RECLAMATION PARCEL THAT INCLUDES A ROAD OR ROAD SEGMENT TO BE <br />RETAINED FOR THE POSTMINING LAND USE. <br />Seneca II-W Findings Document 3 C1982057 <br />Permit Renewal No. 5 December 9, 2010
The URL can be used to link to this page
Your browser does not support the video tag.