My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-14_HYDROLOGY - M1999069
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999069
>
2010-12-14_HYDROLOGY - M1999069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:52 PM
Creation date
12/15/2010 12:19:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999069
IBM Index Class Name
HYDROLOGY
Doc Date
12/14/2010
Doc Name
Substitute Water Supply Plan
From
OSE
To
Applegate Group, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tom Hatton <br />December 9, 2010 <br />Page 5 <br />Court at least three (3) years prior to the completion of mining to include, but not be limited to, <br />long-term evaporation losses. If a lined pond results after reclamation, replacement of lagged <br />depletions shall continue until there is no longer an effect on stream flow. Granting of this plan <br />does not imply approval by this office of any such court application(s). <br />16. In accordance with amendments to §25-8-202(7), C.R.S., and Senate Bill 89-181 Rules and <br />Regulations adopted on February 4, 1992, the State Engineer shall determine if the substitute <br />supply is of a quality to meet requirements of use to which the senior appropriation receiving the <br />substituted supply has normally been put. As such, water quality data or analysis may be <br />requested at any time to determine if the requirements of use of the senior appropriator are met. <br />17. The decision of the state engineer shall have no precedential or evidentiary force, shall not <br />create any presumptions, shift the burden of proof, or serve as a defense in any pending water <br />court case or any other legal action that may be initiated concerning this plan. This decision <br />shall not bind the state engineer to act in a similar manner in any other applications involving <br />other plans, or in any proposed renewal of this plan, and shall not imply concurrence with any <br />findings of fact or conclusions of law contained herein, or with the engineering methodologies <br />used by the Applicant. <br />Please contact loana Comaniciu in Denver at (303) 866-3581, or Claudia Engelmann in Greeley at <br />(970) 352-8712, if you have any questions concerning this approval. <br />Sincerely, <br />Kevi G. Rein, P.E., '&? <br />r Resource Engineer <br />Attachments: Table 3 <br />City of Loveland Lease <br />Letter from DRMS dated April 30, 2010 <br />cc: Claudia Engelmann, Assistant Division Engineer (810 9t' Street, Ste. 200, Greeley, CO 80631 <br />(970) 352-8712) <br />Jason Smith, Water Commissioner, District 4 (810 9t' Street, Ste. 200, Greeley, CO 80631 <br />(970) 290-7397) <br />Division of Reclamation Mining and Safety <br />KGR/W-Wagner/Kauffman Pit No. 3-M99-069 (11 swsp)
The URL can be used to link to this page
Your browser does not support the video tag.