My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-14_HYDROLOGY - M1999006
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999006
>
2010-12-14_HYDROLOGY - M1999006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:52 PM
Creation date
12/15/2010 12:19:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999006
IBM Index Class Name
HYDROLOGY
Doc Date
12/14/2010
Doc Name
Substitute Water Supply Plan
From
OSE
To
Cheryl Signs Engineering
Permit Index Doc Type
Hydrology Report
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'a <br />The Division has identified four approaches for operators: <br />1. FM a financial warranty that will ensure back iling of the pit to cover the exposed pound water to a <br />depth of two feet above the static pound water level or, <br />2. Obtain a court approved augmentation plan prior to exposing pound water or, <br />3. File a financial warranty to cover the cost of installing s day liner or slurry wall that meets the <br />Dhvblon of Water Resources requirements for preventing pound water exposure or, <br />4. Obtain approval from the Division of Water Resauras•that acknowledges compliance with the SEO's <br />requirements pursuant to ! 37.90.137(11}. <br />The Division will work with operators on an individual bull as they move to implement trine of thus plans. It <br />Is likely that options 1 and 3 will require the submittal of a taehnkwl rovIslon or an amendment to the existirig <br />permit depending on the nature of the arrant mining and reclamation plan and the proposed changes. <br />Increased financial warrantlis, as a result of these modiflcetionr, may be posted In a phased manner not to <br />exceed three years. Amendments or revisions currently under review will be required to be approved by <br />April $0,2011 and may use the phased finandal warranty approach described above. New applic itloni going <br />forwird or presently under review by the Division will be required to meet the requirements of one of the <br />optlons i-4 nt the time of epplicatlon•approvai. Failure of ofrieted operators to initlate contact with the . •• <br />Division ind &U.-compliance as described above could result in an enforcement action beinhj Issued by.the f <br />Ohvision. :. _ <br />M you hwe arhy questions, please contact Tony Waldron at 3034664587, extension 8150. <br />• t Lee <br />os: Permit Id Site Name
The URL can be used to link to this page
Your browser does not support the video tag.