ameL4 <br />AMEC field representative was present during ore placement both day and night shift. The first <br />lift was finished 11/23/2010. <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />Drain Cover Fill (DCF) was processed during the week. <br />Location This Week Cumulative Comments <br /> tons (tons) <br />DCF Process 5,024 348,019 <br />Total 5,024 348,019 <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF process area. <br />AMEC continuously monitored the DCF placement. <br />AMEC observed the installation of the high volume solution collection system. <br />AMEC observed loading ore at the Phase 5 PSSA during day and night shift. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture-Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue installation of the high volume solution collection system. <br />Continue DCF placement. <br />Summary of Non-conformances: <br />None Issued <br />VLF WeeklyReport WE 11.27.