Laserfiche WebLink
amec'0 <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: November 13, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 11/07/10 through 11/13/10 <br />Days S M T W T F S <br />Work Shifts D D D D D D D <br /> N N N N N N N <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 16°F to 40°F (+/-) High: 33°F to 56°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: None <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />Subgrade was inspected and approved for soil liner fill placement by an AMEC field <br />representative in the area shown on Figure 1. <br />B) Slope Contouring <br />1) VLF <br />Slope contouring was performed between stations H25+50 (+/-) and H26+00 (+/-), <br />approximately 0 to 400 feet left of centerline using various CAT dozers. <br />C) Cut to Fill <br />1) VLF <br />No work performed during the week. <br />VLF Weekly Report WE 11.