My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-13_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2010-12-13_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:52 PM
Creation date
12/14/2010 8:45:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
REVISION
Doc Date
12/13/2010
Doc Name
Letter, Application and Public Notice
From
Sage Creek Coal Company, LLC
To
DRMS
Type & Sequence
TR1
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peabody <br />Peabody Energy <br />Sage Creek Coal Company, LLC <br />December 9, 2010 <br />Mr. Jason Musick <br />Colorado Division of Reclamation Mining & Safety (DRMS) <br />1313 Sherman Street, Rm 215 <br />Denver CO 80203 <br />29515 Routt County Rd. #27 <br />Oak Creek, CO. 80467 <br />(970) 879-3800 <br />c <br />0C 1 2010 <br />uivwall of F . <br />tUG hV aid Sd* <br />Re: Sage Creek Coal Company - Peabody Sage Creek Mine (Permit No. C-2009-087) Technical <br />Revision (TR01-10) Portal Area Facility Modifications <br />Mr. Musick: <br />Sage Creek Coal Company (SCCC) requests CDRMS approval of a Technical Revision (TRO1-10) to the <br />approved permit for coal handling facility modifications in preparation for construction activities. <br />SCCC recently hired a third-party consultant to '.refine plans for coal handling in an effort to maximize <br />processing efficiency. These refinements resulted in modifications to the facility plans in the area near <br />the portal. None of the changes will result in modifications to the Reclamation Plan, existing disturbance <br />area boundary or have any affect on the existing bond. The modifications will primarily result in changes <br />to the Drainage and Sediment Control Plan (and associated maps) and the Operations plan. <br />Major changes include a relocation of the coal handling facilities pad and access road, and relocation of <br />the upper coal stockpile sump to an area closer to the new coal handling pad. The total amount of <br />material removed for portal excavation will remain the same. <br />This submittal includes a replacement for the existing approved Operations Plan (Sections 2.05.2 and <br />2.05.3), revised North and South End Facilities Maps (2.05.3-MIA and 2.05.3-M1B), and the Sediment <br />and Drainage Control Plan (SedCAD runs for new and relocated ditches and sumps, ditch profile maps, <br />and sump design maps). New and revised PAP materials are identified by the attached Summary of <br />Revisions/Additions and Insertion Instructions. <br />We would appreciate your consideration and cooperation in facilitating timely review and approval of this <br />submittal. Once you have had opportunity to review this submittal package, please feel free to contact me <br />at 970-870-2751 with any questions or comments. <br />Best regar s, <br />B. Scott Cowman <br />Senior Environmental Specialist <br />Sage Creek Coal Company <br />Peabody Sage Creek Mine <br />cc: Mike Ludlow
The URL can be used to link to this page
Your browser does not support the video tag.