Laserfiche WebLink
Varra Companies, Inc. <br />Office of Special Projects <br />8120 Gaee Street Frederick Colorado 80516 Telephone (970) 353-8310 Fax(970)353-4047 <br />D will have their soil stripped and placed in an over the shoulder manner on <br />formerly disturbed ground where soil being absent is not required to be replace. <br />Regardless, the six inches planned for all finished basin perimeters is generally <br />adequate to achieve the stabilization of the area from planned revegetation. <br />The history of the Office of Mined Land Reclamation is replete with released <br />operations where six inches of soil was applied for purposes of achieving <br />stability. Since the lands will not be returned to agricultural production, and the <br />purposes of the operation for profit must be in balance with the capacity to <br />achieve reclamation, the operator maintains that a six inches remains an <br />adequate compromise when considering the pre-mine state of the lands and the <br />geomorphic limits to insitu soils from which salvage must take place. <br />Finally, it should be remembered that the Act calls for the return of topsoil, <br />which is limited to the A-1 horizon or plow layer of the soil profile. The Act <br />does not compel a return of the soil profile, nor would it be prudent to return <br />some aspects of a developed soil profile, which in this instance is essentially <br />absent for all practical purposes. A return of six inches of soil is consistent with <br />the `topsoil' requirements of the Act. <br />18. The applicant states in Exhibit G - Water Information, that the pits will be <br />lined upon the completion of mining. However, the Reclamation Plan does not <br />provide any details about lining the reservoirs. Please clarify if the reservoirs <br />will be lined or unlined. If they are to be lined, then please provide the Division <br />with design specifications and detailed plan for lining the reservoirs. <br />Since the applicant is blessed with waters sufficient to create unlined basins, for <br />purposes of this submittal, the applicant desires to maintain the option of lining <br />extracted basins to liberate water for other purposes than augmentation. Since <br />this is a method reserved for consideration under a subsequent Technical <br />Revision with the Office, we respectfully request the specifics of construction be <br />addressed at that time, since it does not bear upon current financial or permit <br />performance considerations under the present plan of operations. <br />Varra Companies, Inc. correspondence to the Colorado Office of Mined Land Reclamation (OMLR) 10 <br />in reply to OMLR correspondence of 4 October 2010 - Western Sugar Reclamation Land Development Project <br />- M-2010-049.