My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-13_INSPECTION - M1981277
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1981277
>
2010-12-13_INSPECTION - M1981277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:50 PM
Creation date
12/14/2010 7:40:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981277
IBM Index Class Name
INSPECTION
Doc Date
12/13/2010
Doc Name
Stormwater Annual Report
From
Loukonen Bros. Stone Co.
To
DRMS
Inspection Date
11/16/2010
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ M Print Form <br />STORMWATER ANNUAL REPORT - SAND AND GRAVEL <br />,boll, ORAD DFi.OF PUBLIC HEALTH & ENVIRONMENT / ?. <br />Water Quality Control Division <br />WQCD-P-B2 <br />4 300 Cherry Creek Drive South <br />Denver. Colorado 80246-1530 COPY <br />Make enough copies of form for each reporting year: Or go to <br />u!ww.cdhhe.stale.co.uv/tii?d/PerntiisUrtit Check if?this is a <br />Permittec (Company Name): Loukonen Bros. Stone Co. ?I <br />? <br />Facility Name: Beech Hill Quarry <br />Mailing Address: 12993 N. Foothills Hwy. Longmont, CO. 80503 ? <br />Facility Phone Number: 303-823-6268 ? <br />Stormwater Permit Certification No. COR34- C 9 8171 <br />(or Process Water Certification No. COG50- <br />THIS IS A REQUIRED FIELD If this is not filled in the report will be returned. - Please do not input "4000" <br />Reporting Period: Jan. 1-Dec. 31, 20 = (Form is clue by Feb. 15 of the following year) <br />**Each section must be completed. Please print or type.** <br />A. A report on the facility s oveipll compliance with the SW.+I'IP. (Include here a summary of any measures taken <br />to comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or improvements <br />made in any of your Best Management Practices (BMPs), employee training, spills, other problems <br />encountered, etc. How is your plan working?) <br />No changes were made this year, plan is working well! ?.-., F. <br />Were changes made to your SWMP? Q No ? Yes - Describe changes on a separate sheet. <br />B. A stnnntwy of each comprehensive stormwater facility inspection trade, including elate, findings, and action <br />"-'taken: (l'1le {pcriiriYr`equims'afleast two-comprehensive facility-inspections-per-year -see page- l? a£the _ <br />pcnnit. Include here a summary of those inspections. plus any other comprehensive inspections made. It is <br />not necessary to summarize day-to-day inspections, unless significant problems were noted.) <br />First Inspection - Date 03-19-2009 . Findings, and action taken: <br />There were no areas of concern <br />Note - fonn may be reproduced Page 1 of 2 ar6lckinun <br />
The URL can be used to link to this page
Your browser does not support the video tag.