Laserfiche WebLink
-4- <br />12. Prima future (Post-minin land use check one : <br />0 Cropland(CR) Pastureland(PL) <br />R Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br /> General Agriculture(GA) <br />?: Wildlife Habitat(WL) <br /> Industrial/Commercial(IC) <br /> Solid Waste Disposal(WD) <br />13. Primary present land use (check one): <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): Open pit mining operation <br />using truck/shovel or other equipment suitable for an open pit mining operation. <br />15. On Site Processing: -LL Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Product crushing, screening, and stock- <br />piling will occur at this operation for the Hogue River Pit and the Bettger Pit directly north of this operation. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />The amendment will add approximately 11.7 acres to the existing 51.0 acres. It will use the <br />same mining method presently being used. It will create a lake reclaimed wildlife use and <br />possible home sites. <br />4)