Laserfiche WebLink
J&T Consulting, Inc. Broken Arrow Investments, LLI <br />Derr F <br />12/7!201 <br />Bond Quantities and Costs <br />07123 Derr Pit Rec Bond Calm 12.7. <br />Phase 2 (6.80 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Slurry Wall Required to Close Phase 2 2,324 If $ 470.00 $ 1,092,280 <br />Slope Grading From Interim Vertical Slope to 3:1 Final Slope 61,850 cy $ 0.20 $ 12,370 <br />Dewatering of Phase 2 Area 78.1 Mil. Gal. $ 200.00 $ 15,620 <br /> Total Direct Cost $ 1,120,270 <br />Overhead and Profit Cost (12.60%) $ 141,154 <br />Contract Cost $ 1,261,424 <br />Project Management (9.25%) $ 116,682 <br />Additional Financial Warranty Required For Phase 2 $ 1,378,106 <br />Cummulative Financial Warrantv Required For Phase 1A-2 S 1.490.628 <br />Phase 3 (6.92 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost -J <br />Active Mining Area <br />Credit for Slurry Wall Required to Close Phase 2 (2,324) If $ 470.00 $ (1,092,280) <br />Slurry Wall Required to Close Phases 2-3 3,301 If $ 470.00 $ 1,551,470 <br />Slope Grading From Interim Vertical Slope to 3:1 Final Slope 72,570 cy $ 0.20 $ 14,514 <br />Additional Dewatering Req'd for Combined Phases 2-3 Area 79.4 Mil. Gal. $ 200.00 $ 15,880 <br /> Total Di rect Cost $ 489,584 <br />Overhead and Profit Cost (12.60%) $ 61,688 <br />Contract Cost $ 551,272 <br />Project Management (9.25%) $ 50,993 <br />Additional Financial Warranty Required For Phase 3 $ 602,264 <br />Cummulative Financial Warranty Required For Phase 1A-3 $ 2,092,892 <br />Phase 4 (8.40 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Credit for Slurry Wall Required to Close Phases 2-3 (3,301) If $ 470.00 $ (1,551,470) <br />Slurry Wall Required to Close Phases 2-4 4,954 If $ 470.00 $ 2,328,380 <br />Slope Grading From Interim Vertical Slope to 3:1 Final Slope 112,390 cy $ 0.20 $ 22,478 <br />Additional Dewatering Req'd for Combined Phases 2-4 Area 96.5 Mil. Gal. $ 200.00 $ 19,300 <br /> Total Direct Cost $ 818,688 <br />Overhead and Profit Cost (12.60%) $ 103,155 <br />Contract Cost $ 921,843 <br />Project Management (9.25%) $ 85,270 <br />Additional Financial Warranty Required For Phase 4 $ 1,007,113 <br />Cummulative Financial Warranty Required For Phase 1A-4 $ 3,100,005 <br />3 of 4