Laserfiche WebLink
U. S. DEPT. OF .THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ POWDERHORN COAL CO. Permit C-041-81 Field Visit <br />Person Number Date 09/23/2010 Continuation Page <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, 5=Noncompliance Identified Elsewhere, 6=Previously Cited <br />A. <br />B. <br />C. <br />Administrative <br />1. _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6. - Temporary Cessation <br />7. - AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />Hydrologic Balance <br />L. I Drainage Control <br />2. Inspections & Certifications <br />3. 1 Siltation Structures <br />4. 1 Discharge Structures <br />5. 1 Diversions <br />6. Effluent Limits <br />7. Ground Water Monitoring <br />8. Surface Water Monitoring <br />9. Drainage -- Acid-Toxic Materials <br />10. 1 Impoundments <br />11. 1 Stream Buffer Zones <br />Topsoil & Subsoil <br />1. Removal <br />2. Substitute Materials <br />3. Storage and Protection <br />4. 1 Redistribution <br />D. Backfilling & Grading H. <br />Subsidence Control Plan <br />1. Exposed Openings _ <br />I <br />Roads <br />2. 1 Contemporaneous Reclamation . <br />1. 1 Road Construction <br />3.- Approximate Original Contour 2. Certification <br />4. Highwall Elimination 3. Drainage <br />5. Steep Slopes (includes downslope) 4. 1 Surfacing and Maintenance <br />6. Handling of Acid & Toxic Materials 5. Reclamation <br />7. 1 Stabilization (rills and gullies) J. Signs & Markers <br />E. Excess Spoil Disposal 1. <br />Signs <br />1. 1 Placement - <br />2. Markers <br />2. <br />3. 1 Drainage Control <br />Surface Stabilization K. _Distance Prohibitions <br /> <br />4. <br />Inspections & Certifications L. Revegetation <br />1 <br /> <br />F. Coal <br />Mine Waste 1. <br />Vegetative Cover <br />(Refuse Piles/Impoundments) 2. 1 Timing <br />1. - Drainage Control M. I Postmining Land Use <br />2. Surface Stabilization N. Other <br />3. Placement General <br />4. Inspections and Certifications Performan ce <br />5. Impounding Structures Catagory <br />G. Use Of Explosives 1 <br /> <br />1. <br />Blaster Certification - ) <br />2. Distance Prohibitions 2) <br />3. Blast Survey/Schedule - - <br />4._ Warnings & Records ') <br />5. Control of Adverse Effects - - <br />Performance Standard Catagories <br />30 CFR Counterpart <br />A. Administrative ......................................................................... <br />1. Valid Permit ................................................... ..................................773.11 <br />2. Mining within Bonded Area .................. ..............................773.11 <br />3. Terms & Conditions of Permit ............... ..............................773.17 <br />4. Liability Insurance .................................. ..............................800.60 <br />5. Ownership and Control .......................... ..............................778.13 <br />6. Temporary Cessation .............................. 842.11 (e) & 816/817.131 <br />7. AML Rec. Fees -- Non-Respondant ....... .........................870.15(b) <br />8. AML Rec. Fees -- Failure to Pay ............ .........................870.15(a) <br />B. Hydrologic Balance ........................... ...........(816/817.41-57) <br />1. Drainage Control .........................................................................45 <br />2. Inspections & Certifications .............................................49(a)(10) <br />3. Siltation Structures ......................................................................46 <br />4. Discharge Structures ...................................................................47 <br />5. Diversions ...................................................................................43 <br />6. Effluent Limits ............................................................................42 <br />7. Ground Water Monitoring ......................................................41(c) <br />8. Surface Water Monitoring ......................................................41(e) <br />9. Drainage--Acid - Toxic Materials ...........................................41(f) <br />10. Impoundments ............................................................................49 <br />11. Stream Buffer Zones ...................................................................57 <br />C. Topsoil & Subsoil ...............................................(816/817.22) <br />1. Removal ..................................................................................22(a) <br />2. Substitute Materials .................................................................22(c) <br />3. Storage and Protection .............................................................22(c) <br />4. Redistribution ..........................................................................22(d) <br />E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />1. Placement ...........................................................................................71(e) <br />2. Drainage Control ...............................................................................71(f) <br />3. Surface Stabilization ...........................................................................71(g) <br />4. Inspections & Certifications ...............................................................71(h) <br />F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,,(816/817.81-84) <br />1. <br />2. <br />3. <br />4. <br />5. <br />G. <br />1. <br />2. <br />3. <br />4. <br />5. <br />H. <br />I. <br />1. <br />2. <br />3. <br />4. <br />5. <br />J. <br />1. <br />2 <br />D. Backfilling & Grading ..............................(816/817.95-107) K <br />1. Exposed Openings .....................816/81' 7.13, 14, 15, & 823.11 & 21 L <br />2. Contemporaneous Reclamation ............. .....................................100 <br />3. Approximate Original Contour .............. ............................102(a)(1) 1 <br />4. Highwall Elimination ............................. ............................102(a)(2) 2• <br />5. Steep Slopes (includes downslope) ........ ....................................107 M. <br />6. Handling of Acid & Toxic Materials ..... .................................102(c) <br />7. Stabilization (rills and gullies) ............... ...................................95(b) <br />Drainage Control .................................................... ...........................83(a) <br />Surface Stabilization ................................................ ..........................83(b) <br />Placement ................................................................. ..........................83 (c) <br />Inspections and Certifications .................................. .........................83(d) <br />Impounding Structures ............................................. ..............................84 <br />Use of Explosives ............................................ ......(816/817.61-68) <br />Blaster Certification .................................................. .........................61(c) <br />Distance Prohibitions ............................................... ..........................61(d) <br />Blast Survey/Schedule .............................................. .........................62-64 <br />Warnings & Records ................................................ ......................66 & 68 <br />Control of Adverse Effects ....................................... ..............................67 <br />Subsidence Control Plan ................................ .........(817.121-122) <br />Roads ............................................................... .. (816/817.150-151) <br />Road Construction .................................................... .......................150(c) <br />Certification .............................................................. ........................151(a) <br />Drainage ................................................................... ............150(b)-151(d) <br />Surfacing and Maintenance ...................................... ............150(e)-151(d) <br />Reclamation .............................................................. ........................150(f) <br />Signs & Markers .......................................................(816/817.11) <br />Signs ......................................................................... ............ I I (a),(b),&(c) <br />Markers ..................................................................... .1 l (a)>(b)>(d)>(e)>&(fl <br />Distance Prohibitions ..................................... ..................(761.11) <br />Revegetation ................................................... ..(816/817.111-116) <br />Vegetative Cover ...................................................... .................111 & 116 <br />Timing ...................................................................... ............................113 <br />Postmining Land Use ..................................... .........(816/817.133) <br />Revised December 4, 1998 Page 2 of 7