My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-06_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2010-12-06_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:37 PM
Creation date
12/7/2010 8:31:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
12/6/2010
Doc Name
Midterm Review Cost Estimate
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
MT6
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 089 <br />Date : 1210212010 <br />User : JRS <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />2.25 LCY (heaped) Bucket size class <br />0.45 Rock - Poorly blasted (40% - 50916) <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2010 Midterm Review (MT-6) <br />Task description :Remove Concrete Pond Dams <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 330C L <br />Horsepower : 244 <br />Weight (MT) : 33.72 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $45.38 NA Shiftbasis : 1 per day <br />Operating cost/hour : $53.71 100 Data source : (CRG) <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $137.82 Total fleet cost/hour : $137.82 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 610 BCY factor : 2.000 volume : 1,220 LCY <br />Source of estimated volume :1998 Operator Estimate <br />Source of estimated swell factor : Division Estimate <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket swing loaded dump bucket swing empty) <br />Basic job condition description <br />Secondary job condition within basic description <br />Cycle time value <br />Bucket Capacity <br />Rated bucket capacity <br />Bucket fill factor <br />Adjusted bucket capacity <br />SEVERE <br />SEVERE <br />0.45 minutes <br />medium <br />1.01 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 7,000 feet Altitude adjustment : 1.00 I (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Unit cost : $1.216 per LCY <br />State : Colorado <br />County :Delta <br />Site :Bowie No. 1 Mine <br />136.52 LCY/hour <br />113.31 LCY/hour <br />113.31 LCY/hour <br />Total job time : 10.77 hours <br />Total job cost : $1,484 <br />Permit/job #: C-1981-038 <br />Abbreviation :none <br />Filename : C038-089
The URL can be used to link to this page
Your browser does not support the video tag.