Laserfiche WebLink
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organ <br />Task # : 056 <br />Date : 1210212010 <br />User : JRS <br />CIRCES Cost Estimating Software <br />TRUCKILOADER TEAM WORK <br />ization name : Colorado Division Of Reclamation, Mining And Safety <br />State : Colorado Permit/job # : C-1981-038 <br />_ County :Delta Abbreviation :none <br />Site: Bowie No. 1 Mine Filename :C038-056 <br />Permit or other job action :2010 Midterm Review (MT-6) <br />Task description : Haul Asphalt from Haul Road to Portal Bench Zone 4-C <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Truck/loader team -Truck : <br />-Loader: <br />Support equipment -Load area : <br />-Dump area : <br />Road maintenance -Motor grader <br />-Water truck <br />Description <br />, , - t--/ <br />T 990 Series 11 <br />` D10R - 10SU <br />`D10R- 10SU <br />T 14H <br />Tanker, 5,000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />% Utilization-machine : 100 98 100 100 50 50 <br />-Ripper attachment : NA NA 0 0 0 NA <br />Ownership cost/hour : $63.47 $106.04 $76.61 $76.61 $41.68 $24.58 <br />Operating cost/hour : $87.44 $103.03 $128.30 $128.30 $23.13 $16.65 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 NA <br />Operator cost/hour : $22.29 $38.72 $38.54 $38.54 $24.50 $38.70 <br />Unit subtotals : $173.20 $247.79 $243.45 $243.45 $89.31 $79.93 <br />Number of units : 4 1 1 1 1 1 <br />Group subtotals : Work : $940.58 Support : $486.89 Maintenance : $169.24 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 713 BCY <br />Total work team cost/hour : $1,596.71 <br />Swell Loose <br />factor : 1.640 volume : 1,169 LCY <br />Source of quantity take-off :Map 5C-6A and 8A-2 <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2800 pounds/LCY Struck volume <br />Descr.: Granite - Broken Heaped volume <br />Rated payload : 108,060 pounds Average volume <br />Payload capacity: 38.59 LCY Adjusted volume* <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />33.80 LCY <br />45.90 LCY <br />39.85 LCY <br />38.59 LCY <br />37.97 LCY <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 7,100 <br />Rated capacity (nom. heaped) : 11.250 LCY Truck Loader Source <br />Descr.: Blasted rock - poorly blasted (60 - 75%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 0.675 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity: 7.594 LCY Net correction : 0.830 0.830 <br />