Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task #: <br />Date <br />User: <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />014 State : Colorado Permit/job #: C-1981-038 <br />1210212010 County :Delta Abbreviation :none <br />JRS Site :Bowie No. 1 Mine Filename: C038-014 <br />Permit or other job action :2010 Midterm Review (Mt-6) <br />Task description: Haul Fill from Stotage Zone 1-B to Coal Zone 4-B <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Description <br />Scraper work team -Scraper :Cat 637G w/push pull <br />-Push dozer :!NA <br />Support equipment -Load area : NA <br />-Dump area :INA <br />Road maintenance -Motor grader :ICAT 14H <br />-Water truck :I Water Tanker, 5,000 Gal. <br />Cost Bre <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctruk <br />% Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment : NA NA NA NA 0 NA <br />Ownerhip cost/hour : $109.89 NA NA NA $41.68 $24.58 <br />Operating cost/hour : $163.34 NA NA NA $11.56 $8.33 <br />Ripper op. cost/hour : NA NA NA NA $0.00 NA <br />Operator cost/hour : $24.98 NA NA NA $24.50 $38.70 <br />Unit subtotals : $298.21 NA NA NA $77.75 $71.60 <br />Number of units : 2 0 0 0 1 1 <br />Group subtotals : Work : $596.43 Support: $0.00 Maintenance : $149.35 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 25.145 CCY <br />Total work team cost/hour : $745.77 <br />Swell Loose <br />factor : 1.165 volume : 29.294 LCY <br />Source of quantity take-off :Map 5C-6A and 8A-2 <br />Source of estimated swell factor : CAT Handbook