Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 007 State : Colorado Permit/job# : C-1981-038 <br />Date : 1210212010 County :Delta Abbreviation :none <br />User: JRS Site : Bowie No. 1 Mine Filename : C038-007 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2010 Midterm Review (MT-6) <br />Task description :Push Fill from East Highwall Zone 4-D to West Zone 4-D <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D10R - 10SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Horsepower: 570 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $89.77 NA <br /> Operating cost/hour : $128.30 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $256.60 Total fleet cost/hour: -$1,026.41 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,489 C CY factor : 1.165 volume : 1,735 LCY <br /> <br />Source of estimate d volume: Map 5C-6A and 8A-2 <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 633.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,300 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2900 lbs/LCY Net correction : 0.36 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 225.04 LCY/hr <br /> Adjusted fleet production : 900.15 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 1.93 Hours <br />Unit cost : $1.140 /LCY Total job cost : $1,978 <br />