(e) A plan or schedule indicating how and when reclamation will be implemented. Such plan or <br />schedule shall not be tied to any specific date but shall be tied to implementation or completion of <br />different stages of the mining operation as described in Subparagraph 6.4.4(1)(e). The plan or schedule <br />shall include: <br />(i) An estimate of the periods of time which will be required for the various stages or phases of <br />reclamation; <br />(ii) A description of the size and location of each area to be reclaimed during each phase; and <br />(iii) An outline of the sequence in which each stage or phase of reclamation will be carried out. <br />(The schedule need not be separate and distinct from the Reclamation Plan, but may be incorporated therein.) <br />(0 A description of each of the following: <br />(ii) Seeding - specify types, mixtures, quantities and expected time(s) of seeding and <br />planting-, <br />(iii) Fertilization - if applicable, specify types, mixtures, quantities and time of application; <br />(iv) Revegetation - specify types of trees, shrubs, etc., quantities, size and location; and <br />(v) Topsoiling - specify anticipated minimum depth or range of depths for those areas <br />where topsoil will be replaced. <br />EXHIBIT F - Reclamation Plan Map (Rule 6.4.6): The map(s) of the proposed affected land, by all phases of <br />the total scope of the mining operation, shall indicate the following: <br />(a) The expected physical appearance of the area of the affected land, correlated to the proposed <br />mining and reclamation timetables. The map must show proposed topography of the area with contour lines of <br />sufficient detail to portray the direction and rate of slope of all reclaimed lands; and <br />(b) Portrayal of the proposed final land use for each portion of the affected lands. <br />EXHIBIT G - Water Information (Rule 6.4.7): (1) If the operation is not expected to directly affect surface or <br />groundwater systems, a statement of that expectation shall be submitted. <br />(2) (c) Submit a brief statement or plan showing how water from dewatering operations or from runoff <br />from disturbed areas piled material and operating surfaces will be managed to protect against pollution <br />of either surface or groundwater (and, where applicable, control pollution in a manner that is consistent <br />with water quality discharge permits), both during and after the operation. <br />(3) You must provide an estimate of the project water requirements including flow rates and annual volumes <br />for the development, mining and reclamation phases of the project. Please provide an estimate of water <br />consumption for dust control and or crushing. <br />(4) You must indicate the proiected amount from each of the sources of water to supply the proiect <br />water requirements for the mining operation and reclamation.