My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-30_PERMIT FILE - M2010055
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010055
>
2010-11-30_PERMIT FILE - M2010055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:22 PM
Creation date
12/1/2010 10:52:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010055
IBM Index Class Name
PERMIT FILE
Doc Date
11/30/2010
Doc Name
Adequacy Review-02
From
DRMS
To
Baseline Engineering Corp.
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />November 30, 2010 <br />Chris Rundall <br />Baseline Engineering Corp. <br />1536 Cole Blvd., Suite 200 <br />Golden, CO 80611 <br />RE: Konig Borrow Pit; DRMS File No. M-2010-055; Adequacy Review - 02 <br />Dear Mr. Rundall, <br />COLORADO <br />D IV IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The Division has identified several other comments and questions that must be addressed prior to <br />the Division's decision due date. Please be advised that if you are unable to satisfactorily <br />address any concerns identified in this review before the decision date, it will be your <br />responsibility to request an extension of the review period. If there are outstanding issues <br />that have not been adequately addressed prior to the end of the review period, and no <br />extension has been requested, the Division will deny this application. <br />6.4.5 Exhibit E - Reclamation Plan <br />1. The Applicant has provided a plan for managing stormwater on the site which includes the <br />construction of stormwater diversion ditches and sediment ponds. Please provide a narrative <br />describing how the structures associated with stormwater management will be reclaimed. <br />6.4.12 Exhibit L - Reclamation Costs <br />2. The financial warranty estimate provided by the Applicant did not include costs for <br />reclaiming stormwater management structures. Please provide the costs to reclaim the <br />stormwater structures. The costs should include backfilling the stormwater diversion ditches <br />and sediment ponds and removal of riprap inlet/outlet structures. <br />As previously mentioned, if you are unable to provide satisfactory responses to any inadequacies <br />prior to December 28, 2010, it will be your responsibility to request an extension of time to <br />allow for continued review of this application. If there are still unresolved issues when the <br />decision date arrives and no extension has been requested, the application will be denied. <br />01 Li f? <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.