Laserfiche WebLink
Table 1 <br />• Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Summary of Earthworks Material Specifications <br />is <br />L J <br />ameO <br />Material Plasticity Permeability Grain Size Distribution <br /> Index cm/sec Sive Size Percent Passim <br />Underdrain Fill 12" 100 <br /> 15 max N/A <br />UF) No. 200 0-6 <br />Select Structural Fill <br /> N/P N/A 3" 100 <br />(SSF) <br /> .75" 100 <br />Leak Detection Fill .375' 40-70 <br />(LDF) N/P N/A No. 4 5-50 <br /> No. 40 0-20 <br /> No. 200 0-10 <br /> 1" 100 <br />Low Volume Solution Collection Fill 375' 40-70 <br /> N/P N/A . <br />(LVSCF) No. 4 5-55 <br /> No. 200 0-10 <br />Structural Fill 30 max N/A 24" 100 <br />(SF) No. 200 0-25 <br />Pipe Bedding Material 2" 100 <br />(PBM) 15 max N/A No. 4 30-100 <br /> No. 200 5-20 <br />Soil Liner Fill 2" 100 <br /> 10 min 1.00E-06 <br />SFL) No. 200 15-65 <br /> 1.5" 100 <br />Select Drain Cover Fill N/P N/A .75" 70-100 <br />(SDCF) No. 4 5-50 <br /> No. 200 0-8 <br /> 1.5" 100 <br />Drain Cover Fill N/P N/A .75" 70-100 <br />(DCF) No. 4 5-50 <br /> No. 200 0-8 <br />Granular Filter Material 3" 100 <br />(GFM) 15 max N/A 2" 75-100 <br /> No. 200 0-15 <br />Coarse Shaft Backfill 20 max N/A 12" 100 <br />(CSB No. 200 0-15 <br /> 2" 100 <br />Fine Shaft Backfill 15 max N/A .75" 70-100 <br />(FSB) No. 40 20-50 <br /> No. 200 2-15 <br />N/P- Non-Plastic, N/A- Not Applicable <br />Page 1 of 1