Laserfiche WebLink
0 ameo <br />was overlapped a minimum of 3 inches. If soap bubbles appeared, AMEC marked and <br />documented the leak location. Lone Star then repaired the leak and vacuum tested the <br />repair. This procedure was also followed to test extrusion repairs and extrusion patches. <br />The seam non-destructive test summaries (fusion pressure tests and extrusion vacuum <br />tests) for the secondary and primary PSSA geomembrane layers are presented in <br />Appendix K-7 and L-7, respectively. <br />6.3 Underground Workings Geosynthetics <br />Quality Control certifications provided for the geogrid is presented in Appendix 0-2. <br />Conformance testing results performed on geogrid used in the remediation of the <br />underground workings within the footprint of the Phase 5 VLF are presented in <br />Appendix 0-3. AMEC monitored geogrid installation. <br />0 Conformance testing for geogrid used for Phase 5 VLF construction met specifications. <br />• <br />AMEC Earth & Environmental, Inc. <br />2000 S. Colorado Blvd 2-1000 <br />Denver, CO 80222 <br />Tel 303-935-6505 <br />Fax 303-935-6575 <br />www.amec.com <br />57