My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (181)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (181)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:27 PM
Creation date
12/1/2010 6:47:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL.1 Cover & table of contents
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 ameO <br />The following sections present a detailed description of each of the above activities. <br />6.1.1 Conformance Testing <br />Geomembrane manufactured by Poly-Flex was installed in the 2010 Phase 5 VLF. A TRI <br />(AMEC subcontractor) representative performed geomembrane conformance sampling at <br />the Poly-Flex plant in Grand Prairie, Texas. Samples were sent to TRI's geosynthetic <br />laboratory in Austin, Texas, for conformance testing. Geomembrane rolls were not used on <br />the project unless approved by AMEC based on conformance test results. <br />Prior to the 40-mil, 80-mil, and 100-mil geomembrane arrival to site, AMEC performed <br />23 conformance tests at a frequency of one test per 118,655 square feet, exceeding the <br />minimum specified testing frequency of one test per 150,000 square feet. Testing frequency <br />was based on AMEC's inventory of the 40-mil, 80-mil, and 100-mil geomembrane. <br />Conformance testing for the 40-mil smooth, 80-mil single-sided textured, 100-mil smooth, <br />• 100-mil single-sided textured, and 100-mil double-sided textured LLDPE geomembrane <br />used to construct the 2010 Phase 5 VLF liner system met specifications. Conformance test <br />results are presented in Appendix M. <br />6.1.2 Deployment Monitoring <br />Geomembrane panel deployment monitoring performed by AMEC included: <br />• Observation of panel surface condition and panel overlap; <br />• Assignment of panel numbers; <br />• Verification of factory roll number and receipt of complete certification <br />prior to allowing deployment; <br />• Measurement of sheet thickness; <br />• Documentation of deployed panel lengths; and <br />• Development of panel layout record drawing; <br />4) <br />AMEC Earth & Environmental, Inc. <br />2000 S. Colorado Blvd 2-1000 <br />Denver, CO 80222 <br />Tel 303-935-6505 <br />Fax 303-935-6575 www.amec.com 42
The URL can be used to link to this page
Your browser does not support the video tag.