My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-26_ENFORCEMENT - C1981019
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981019
>
2010-11-26_ENFORCEMENT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:18 PM
Creation date
11/29/2010 9:42:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
ENFORCEMENT
Doc Date
11/26/2010
Doc Name
Signed Settlement Agreement for NOV
From
Colowyo Coal Company
To
DRMS
Violation No.
CV2010004
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OFCOIO <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />• yes. 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 WAIVi a3 <br />2w? 2010 <br />SETTLEMENT AGREEMENT ?rva;, r??,.r <br />NOWCO NO.: CV-2010-004 " a,• ? ' <br />MINE: Colowyo Coal Mine DATE ISSUED: August 23, 2010 <br />PERMIT NO.: C-1981-019 TYPE OF MINE: Surface/Federal <br />OPERATOR/PERMITTEE: COUNTY: Moffat <br />Colowyo Coal Company L.P. <br />ATTENTION: Kurt Blunt <br />ADDRESS: 5731 State Highway 13 <br />Meeker, CO 81641 <br />The Division of Reclamation, Mining and Safety ("the Division") issued a certain Notice of Proposed Amount of <br />Civil Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on November 10, 2010, the Division and the operator <br />hereby agree as follows: <br />1. The amount of the penalty shall be $1,125.00; <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from <br />the date this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further rights <br />to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: Co # 4,00 cmd r inmu L P DATE: 16 <br />By O <br />DIVISION F RECLAMATION, MINING AND SAFETY: <br />By J' DATE: D b <br />Conferenc fficer <br />By <br />Division Director <br />Penalty Adjustment Reviewed <br />[Rule 5.04.3(4)(c)] <br />CRS 34-33-123(8)(c) and (d)
The URL can be used to link to this page
Your browser does not support the video tag.