Laserfiche WebLink
11-14-2008 11:53 From- <br />T-073 P.008/008 F-824 <br />(a) Permanent erosion and sediment control measures that shall be installed <br />at the earliest practioable time consistent with good construction <br />practices and that shall be maintained and replaced as necessary <br />throughout the life of the project. <br />(b) Temporary erosion and sediment control measures that shall be <br />coordinated with permanent measures to assure economical, effective, <br />and continuous control throughout the construction phase and during the <br />operation of the project. <br />1:40) Cerrificadon/CemFea3nnRequir? is