Laserfiche WebLink
11-14-2008 11;s2 From- <br />T-073 P.006/008 F-624 <br />(6) At least fifteen days prior to commencement of a project in a watercourse, <br />which the Division has certified, or conditionally certified, the perrnittee shall <br />notify the following; <br />(i) Applicable local health departments; <br />(b) Owners or operators of municipal and domestic water treatment intakes <br />'which are located within twenty miles downstream from the site of the <br />project; and <br />(c) Owners or operators of other intakes or diversions which are located <br />within five miles downstream from the size of the pro}ect. <br />The permittee shall maintain a list of the persons and entities notified, <br />including the date and form of notification. <br />(7) Itmnediately upon discovery of any spill or other discharge to waters of the <br />state not authorized by the applicable license or permit, the permittee shall <br />notify the following; <br />(a) Applicable local health departments; <br />(b) Owners or operators of municipal and domestic water treatment intakes <br />which are located within twenty miles downstream from the site of the <br />project; and <br />(e) Owners or operators of other intakes or diversions which are located <br />within five miles downstream from the site of the project. <br />The pelmittee shall maintain a list of the persons and entities notified, - <br />including the date and form of notification. <br />(8) Construction operations within watercourses and water bodies shall be <br />restricted to only those project areas specified in the federal license or permit. <br />(9) No construction equipment shall be operated below the existing water surface <br />unless specifically authorized by the 401 certification issued by the Division. <br />(10) Work should be carried out diligently and completed as soon as practicable. <br />To the maximum extent practicable, discharges of dredged or fill material shall <br />be restricted to those periods when impacts to designated uses are minimal. <br />(11) The project shall incorporate provisions for operation, maintenance, and <br />replacement of Bh2s to assure compliance with the conditions identified in <br />this section, and any other conditions placed in the permit or certification. All <br />such provisions shall be identified and compiled in an operation and <br />maintenance plan which will be retained by the project owner and available for <br />inspection within a reasonable timeframe upon request by any authorized <br />representative of the Division. <br />I: 401 Certifauion/CatificationPaquirommts