Laserfiche WebLink
Updated 10/07 <br />Table 4.8.1 - page 2 <br />• Peak Flow Diameter <br />Culvert No (cfs) (in) Quantity Footnote <br />Future <br />AE-14 11 24 1 <br />AE 15 16 30 1 <br />F-16 52 42 1 or 2 culverts at 30 in <br />F-17 18 1 <br />F-18 36 1 <br />GZ-3 12 24 1 <br />GZ-4 6 18 1 <br />Footnote column indicates culverts that drain undisturbed areas. <br />Note: See map M51, Drainage and Sediment Control, fa all culvert locations. ITR-50, TR-54, TR-61, TR-79, MR-172, PR-5, PR-6J <br />R4-8-11 1012007 <br />• <br />rI <br />L <br />4-174a Revision; <br />/approved: