My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-12_PERMIT FILE - C1981010A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2010-11-12_PERMIT FILE - C1981010A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:46 PM
Creation date
11/26/2010 1:47:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
11/12/2010
Doc Name
page 4-172 to 4-222z
Section_Exhibit Name
4.8 Hydrologic Impacts
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 4.8.1.3 Post Mine Drainages Stabilization <br />Section 4.8.1.3 discusses stabilization of reestablished drainageways on reclaimed range and croplands. <br />A discussion of postmine topography for reestablished drainageways and associated reconstruction crite- <br />ria are in Section 3.5.3. <br />A drainages channel and its tributaries (drainages) are those features which occur on concave segments <br />of slopes, and result in a relatively unbroken, defined channel(s) which can be traced to another <br />down-gradient stream or channel. Any erosional feature which is within fifty feet either side of a <br />drainageway will be considered part of reestablished drainageways. A rill or gully outside of the corridors <br />is a sideslope feature and will be handled according to methods discussed in Section 3.6.3.6, Rill and <br />Gully Control Plan. The above definition will aid both Trapper and the Division in distinguishing between <br />those features and areas subject to this section and those subject to Section 3.6.3.6. <br />The final stabilization of drainageways will follow along with vegetative establishment within the drainage. <br />Where periodic water flow prevents vegetative establishment, a temporary channel may be constructed <br />and maintained until the postmine channel is sufficiently stabilized. When such a method is anticipated, <br />the Division will be furnished design criteria for the temporary channel prior to construction. <br />Once final regrade is complete topsoil will either be laid up to the edge of the drainages (but not in the <br />• channel) or the entire drainages will have topsoil replaced. The decision to topsoil or not to topsoil will be <br />based on several criteria. Acceptable erosion control techniques must be feasible such that topsoil in <br />drainageways can be reasonably protected. However, even with protection, runoff events may occur that <br />result in some loss of topsoil from the drainages. Also, superior establishment of vegetation must have <br />been demonstrated through the use of topsoil (see Section 3, 1987-91 Annual Reports). If not, topsoil <br />may not be placed in drainageways. Further, if topsoil placement reduces channel stability, then topsoil <br />will not be placed in drainageways. Where the Division approves rip rap as a channel lining, topsoil will <br />not be placed in the drainageways. <br />• <br />4-183 <br />f19--4 <br />N4A'f 131998. .
The URL can be used to link to this page
Your browser does not support the video tag.