• 1.4.3 Facilities Removal <br />The estimate for the cost of facilities removal is based on escalation of the value approved in <br />early 2006. A 5% escalation was applied to account for unit cost increases. The 2006 estimate is <br />based on data from RS Means Building Construction Cost data and information from DRMS. <br />1.4.4 ReveQetation <br />All Areas where topsoil had been placed back over disturbed ground would require the <br />establishment of permanent vegetation in order to prevent erosion and make the land productive <br />as either cropland or rangeland (refer to Section 3.6). Table 1.4 -10 summarizes the calculation of <br />a total revegetation cost for each post- mining land use by areas as based upon total estimated <br />costs per acre and the number of affected acres. <br />The costs per acre are detailed in Tables 1.4 -11, 12, 13, and 14 according to equipment <br />production costs, material costs, and estimated operating rates for each land use. The <br />equipment costs were based on equipment types similar to the equipment presently being utilized <br />at Trapper Mine for reclamation work. <br />1.4.5 Miscellaneous Costs <br />A determination of the worst case year for the reclamation bond during the five year permit term <br />is given in Table 1.4 -15. <br />Various miscellaneous costs are addressed in Appendix A. A summary of these costs is shown <br />in Table 1.4 -16. <br />• <br />1 -53 <br />Revision: <br />II / /z //a <br />