My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-12_PERMIT FILE - C1981010A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2010-11-12_PERMIT FILE - C1981010A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:47 PM
Creation date
11/26/2010 1:46:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
11/12/2010
Section_Exhibit Name
1.0 Introduction
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 1.4.3 Facilities Removal <br />The estimate for the cost of facilities removal is based on escalation of the value approved in <br />early 2006. A 5% escalation was applied to account for unit cost increases. The 2006 estimate is <br />based on data from RS Means Building Construction Cost data and information from DRMS. <br />1.4.4 ReveQetation <br />All Areas where topsoil had been placed back over disturbed ground would require the <br />establishment of permanent vegetation in order to prevent erosion and make the land productive <br />as either cropland or rangeland (refer to Section 3.6). Table 1.4 -10 summarizes the calculation of <br />a total revegetation cost for each post- mining land use by areas as based upon total estimated <br />costs per acre and the number of affected acres. <br />The costs per acre are detailed in Tables 1.4 -11, 12, 13, and 14 according to equipment <br />production costs, material costs, and estimated operating rates for each land use. The <br />equipment costs were based on equipment types similar to the equipment presently being utilized <br />at Trapper Mine for reclamation work. <br />1.4.5 Miscellaneous Costs <br />A determination of the worst case year for the reclamation bond during the five year permit term <br />is given in Table 1.4 -15. <br />Various miscellaneous costs are addressed in Appendix A. A summary of these costs is shown <br />in Table 1.4 -16. <br />• <br />1 -53 <br />Revision: <br />II / /z //a <br />
The URL can be used to link to this page
Your browser does not support the video tag.