2 -28 <br />• 2.2.1 Buildings and Other Facilities <br />MINE SITE <br />One office trailer is located on the mine bench. The 3MV substation is <br />supported by six concrete footers which are two feet wide. There is a high <br />voltage overhead power line that extends from the existing Grand Valley Power <br />mainline to the portal area substation. The power line is approximately 2200 feet <br />long. There is a 2,370 foot long fiber optic cable supported on short telephone <br />poles that extends from the mine office to the office trailer located on the mine <br />bench. The 40'X 80' shop building was constructed with a concrete floor. A <br />2,000 gallon fuel storage tank sits above a steel lined 4,000 gallon vault which <br />provides secondary containment. <br />The conveyor belt exits the mine and discharges into a crushing and <br />screening facility. This facility is comprised of a 7'X 16' double deck screen and <br />a triple roll crusher. The sized product from the crushing and screening facility is <br />• conveyed to a coal stockpile by a 120 -foot 36 -inch radial stacker belt. The radial <br />stacker wheels are supported by a retaining wall and concrete runway. The <br />foundation for the crushing and screening facility is a concrete pad with wing <br />walls. Figure 2.2 -2 shows the location of buildings and other facilities which area <br />listed in Table 2.1 -1. Figure 2.2 -6 shows buildings and other facilities located in <br />the vicinity of the portal bench. During 1989, the Operator installed a bulk <br />rockdust bin and a concrete footer for its support. <br />The 48 -inch mine belt is supported by a channel /truss frame and extends <br />approximately 24 feet outby the portal where it discharges onto the screen deck. <br />A 40 -foot long 48 -inch conveyor collects sized coal from the screen and crusher <br />and conveys the product to the stacking belt. <br />0 <br />McClane -MR -49 Volume 1 09/10 <br />