My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-20_PERMIT FILE - C1996083A (9)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-09-20_PERMIT FILE - C1996083A (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:22:54 PM
Creation date
11/26/2010 10:59:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
9/20/2010
Doc Name
pg 2.05-1 to 2.05-58i
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.2 <br />During the first quarter of 2000 the Operator obtained Amendment No. 1 to Federal <br />Right -of -Way COC- 62688. This right -of -way allowed the Operator to develop <br />F=ederal coal. The Federal coal involved included an extension ofthe North Mains <br />and mining most of the D3 headgate. This mining was necessary so longwall panel <br />D3 could be blocked out and ready to mine. <br />Federal Coal lease COC -61209 was effective September 1, 2000. This coal lease <br />allowed the Operator to extend its development to the north into Federal Coal. <br />During June 2000 the Operator amended the permit (TR -16) to allow advance of the <br />D4 headgate and the North Mains so longwall panel D4 could be blocked out and <br />ready to mine. The amendment also provided for extending the bleeder system to <br />the north. During September 2000, the Operator amended the permit (TR -18) to <br />allow longwall mining in Federal and private coal at the west end of the D2 Panel <br />and at the western edge of Bowie Resources LLC's fee coal property in the D3 <br />Panel. <br />During February 2001, the DRMS approved the Operator's mine plan revision which <br />• included mining in the Iron Point Federal Coal Lease. <br />The Operator developed portals in the B -Seam and initiated development in the B- <br />Seam late in 2003. Longwall mining in the D -Seam was completed during March <br />2005. Longwall production was initiated in the B -Seam during April 2005 and was <br />competed in the northeast section of the mine in March 2010. Mining continues in <br />the Iron Point Federal Coal Lease. <br />The permit is being revised by TR 68 to provide for an incidental permit boundary <br />revision and associated extension of the mine plan. The 80 acre incidental permit <br />boundary revision is located west of Terror Creek. Mining in this area will extend <br />the life of the mine about three months. This technical revision is necessary to <br />keep the mine operating until permit re✓ision number 12 is approved. Permit <br />revision number 12 provides for extensive mining west of Terror Creek. Coal will <br />be mined from federal coal lease G37210. The lease was originally part of the <br />Bowie No. 1 permit but by this revision the appropriate potion of the lease will be <br />incorporated into the Bowie No. 2 permit. <br />• <br />TR -68 2.05-2- 08/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.