Laserfiche WebLink
November 23, 2010 <br />2 <br />the Division of Water Resources after plugging each well. It appears that several other residential wells <br />are located within the proposed mining area. If the applicant wishes to mine through any additional wells <br />during the operation the same procedure should be followed with the consent of the well owner. <br />Last, the applicant proposes diverting the Second Park Lateral Ditch, currently running through <br />the proposed mine site, through a pipeline and back to the ditch downstream of the property. The <br />applicant needs to coordinate any changes to the ditch with the ditch owner and the water commissioner <br />to ensure that the project does not injure other water users. <br />Thank you for the opportunity to comment on this project. If you have any questions, please <br />contact this office. <br />Sincerely, <br />Karlyn Adams <br />Water Resource Engineer <br />KAA: Fruita Loadout C-2010-088(NP).docx <br />cc: Bob Hurford, Division Engineer, Division 4 <br />Aaron Todd, Water Commissioner, District 60