Laserfiche WebLink
Additionally, as each 40' high terrace is completed, the surface of the terrace will be re-vegetated as described <br />above. Rip-rap will be installed for a channel width of 6 feet at each end of the impoundment, at the intersection <br />with the natural grade, to provide a permanent stonnwater control. The existence of a natural diversion channel will <br />also be acceptable for stormwater diversion as is found near the bottom half of the impoundment area. This natural <br />channel is incorporated into the sedimentation pond. <br />More reclamation details are to be found in Exhibit D and within the maps and drawings of Exhibit E. <br />Specific details about the Tailings Impoundment Structures can be found above in 6.3.3(1)(e). <br />6.3.3(2)(c) <br />Drainage control within the Tailings Impoundment Affected Area has been considered using the U.S. Soil <br />Conservation Service, Technical Release 55: Urban Hydrology for Small Watersheds, USDA (U.S Department of <br />Agriculture), June 1986 for design guidance. Additionally, the USDA Natural Resources Conservation Service has <br />published software for analysis of systems covered by the Technical Release 55. <br />The up-gradient native watershed from the Tailings Impoundment was analyzed using the following assumptions: <br />• Drainage area of approximately 40 acres <br />• "Group D" hydrologic soil classification, with relatively low infiltration (not because of swelling clays, but <br />because of shallow nature of soil over rather impervious bedrock conditions). <br />• Run Off Curve number, weighted = 73, within a meager rangeland (50-75% cover) with moderate brush and <br />minimal forestation. <br />• An average slope of 0.3 ft/ft. <br />The watershed of the affected Tailings Impoundment was analyzed using the following assumptions. <br />• Drainage area of approximately 8 acres, total buildout considered with phased reclamation <br />• "Group C" hydrologic soil classification (sandy clay), a moderately low degree of rainwater infiltration at 0.05- <br />0.15 in/hr. <br />• Run Off Curve number, weighted = 74, within a meager rangeland (50-75% cover) with minimal brush and no <br />immediate forestation. <br />• An average slope of 0.6 ft/ft on embankment faces. <br />As reported by NOAA's Atlas 2 Vol. 1.11 precipitation maps for Colorado, the following data is relevant for this site: <br />• 100 year/24-hour precipitation = 3.8" or 0.158"/hr., Type II distribution <br />• 10 year/24-hour precipitation = 2.6" or 0.108"/lu., Type II distribution <br />A 100 year/24-hour event will produce the following Peak Discharge and Runoff at the Tailings Impoundment <br />storm management diversion structures from the upland area: <br />• Peak Discharge within the diversion ditches = +/- 80.8 cfs. Each side of the complex will receive <br />approximately one half of this flow, or 40.4 cfs. Design has been considered at total Bench 45 buildout with <br />full perimeter ditch. <br />• The Peak Discharge spikes for a two hour period, as illustrated below. <br />Considering the above data and design guidance for riprap revetment provided by the Federal Highway <br />Administration Hydraulic Engineering Circulars HEC-11 & HEC-15 and the Urban Drainage c& Flood Control <br />Criteria, it has been detennined that a perimeter diversion ditch with the following parameters will be sufficiently <br />adequate to safely pass a 100 year/24-hour storm event and limit damage to the Tailings Impoundment: <br />• Diversion Ditch -A trapezoidal charnel with a bottom width of 6 feet, side slope of 1:1 and a minimum clear <br />depth of 2 feet shall be constructed at each end of the impoundment bench as it is raised, at the intersection with <br />the natural grade, to provide a permanent stormwater control. Type L riprap, sized nominally with a median <br />diameter of Dso=9 inches, shall be hand placed at a depth of 18 inches. Rubble and/or slightly weathered stone <br />sorted on-site from available material that meets this size specification shall be acceptable for use. <br />This perimeter ditch will be constructed in phases as the impoundment expands. Refer to Exhibit E Drawing E7 <br />for the Phase I ditch and Drawing E 10 for Phase 2 ditch. Interim diversion along the projected side slope line, <br />Page 31 of 37