Laserfiche WebLink
An adjustment of the standing bond shall be made to reflect continuing operations forward of Bench #2 to total <br />build-out, more specifically the completion through Bench #5 (scheduled to occur at 90 monthsn.5 years): <br />Refer to the Reclamation Cost Schedule in the following appendix for more detailed information. <br />Additional Bond Requirement to Proceed from Bench #2 thru <br />Total Build-out of Bench #5 <br />Tailings Impoundment Maximum Disturbance - Bench #5 $78,191.54 <br /> <br />Tailings Impoundment Maximum Disturbance - Bench #2 $55,548.67 <br /> <br />Difference Bench #5 - Bench #2 $22,642.88 <br /> <br />Additional 5% DRMS Office Admin., per 6.3.4 2 c $1,132.14 <br /> <br />Total Bond Adjustment for Maximum Disturbance - Bench #5 $23,775.02 <br />Appendix to Exhibit D <br />1. Clear Creek County Mining District Zoning Regulations <br />4. Reclamation Cost Schedule, Rev. 3 <br />5. Tailings Impoundment Capacity <br />6. Letter from Doyle Construction, Inc. regarding third party contractor reclamation <br />7. NRCS reclamation recommendations & seed mix specification (replaces Arkansas Valley Seed Co. <br />"Mountain Mix") <br />Page 9 of 9