My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-22_PERMIT FILE - X200518906
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200518906
>
2010-11-22_PERMIT FILE - X200518906
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:12 PM
Creation date
11/22/2010 9:03:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200518906
IBM Index Class Name
PERMIT FILE
Doc Date
11/22/2010
Doc Name
Coal Exploration Final Reclamation Report
From
Trapper Mining, Inc
To
DRMS
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />* /876 s <br />?'x kkf !5,e S9 W <br />COAL EXPLORATION FINAL RECLAMATION REPORT NQY Z ' 2O1O <br />Pr n'r:;g an:i Ea4ty <br />Prospector: Trapper Mining Inc. <br />Address: P.O. Box 187 <br />Craig, Colorado 81626 <br />Date: <br />Notice of Intent No.: NOI-CX-2005-189-06 <br />Project Name: Underground Feasibility Phase I <br />County: Moffat <br />November 19, 2010 <br />This report is filed in accordance with Rule 2.02.6(3)(b) of the Regulations of the Colorado <br />Mined Land Reclamation Board for Coal Mining, adopted in accordance with the Colorado <br />Surface Coal Mining Act, C.R.S. 34-33-101 et seq. This report is to be submitted within 30 <br />days after the end of the period of exploration specified in the approved Notice of Intent, as <br />amended. <br />1. Attach a map showing: <br />a) The final locations of all holes drilled during this project; <br />b) the locations of all roads modified or constructed for the project; and <br />c) All areas significantly disturbed by the operator. <br />2. Have all disturbed areas, including drill holes, been reclaimed in accordance <br />with the approved plan and the above-referenced regulations? Yes <br />3. Were any newly constructed project roads retained for the landowner? No <br />If yes, a) attach a letter from the landowner that grants consent, b) indicate the <br />road location on a map, and c) describe the approximate specifications of the <br />road (width, length, surface material used). <br />4. Did any drill holes experience surface artesian flow conditions? Yes <br />If yes, locate these holes on a map and describe sealing and plugging procedures <br />that were used. <br />5. Were any drill holes converted to a water well? No If yes, list the State <br />Engineer's Well Permit Number and name and address of the user.
The URL can be used to link to this page
Your browser does not support the video tag.