November 17, 2010 C-1981-018/Deserado Mine JHB <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />Y - Air Resource Protection R - Roads <br />R - Availability of Records Y - Reclamation Success <br />Y - Backfill & Grading R - Revegetation <br />NA - Excess Spoil and Dev. Waste R - Subsidence <br />Y -Explosives Y - Slides and Other Damage <br />Y - Fish & Wildlife R - Support Facilities On-site <br />R - Hydrologic Balance R - Signs and Markers <br />Y - Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br />NA -Other NA - Special Categories Of Mining <br />R - Processing Waste Y -Topsoil <br />COMMENTS <br />AVAILABILITY OF RECORDS - Rule 5.02.4(1): <br />Records were verified in the mine office. Records were up to date and complete. Availability of Records <br />form is included with this report. <br />HYDROLOGIC BALANCE - Rule 4.05? ?Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, <br />4.05.6; Discharge Structures 4.05.7, 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br />Monitoring 4.05.13; Surface Water Monitoring 4.05.13; Drainage - Acid and Toxic Materials 4.05.8; <br />Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />RDA Pond 2/3 was holding water in the side cells but dry in the lower cell. RDA Pond4 was dry. RDA <br />Pond 5A is dry and embankments are vegetated. RDA pond 1 is dry and well vegetated. <br />Railroad pond 1 had a small puddle of water in the bottom well below the discharge elevation, There is one shrub, <br />greasewood, on the embankment adjacent to the emergency spillway. This is rooted above the discharge elevation <br />and is well above any potential water level. Rail road sump has a tiny puddle in the bottom of the sump. <br />Activities at the lagoon have progressed. The pumps are in place but were not running at the time of the <br />inspection. The old above surface waterline on the south side of the lagoon remains in place and in use. A control <br />panel has been erected. The operator discussed BME placing a protective shed over the control panels. <br />Slot storage ponds 1 & 2 are damp but do not have a standing pool of water in either pond. Neither pond is <br />discharging. Embankments of both slot storage ponds are well vegetated. SS! had sediment cleaned from the inlet <br />this fall, so some portions of the embankment has had some vegetation knocked down. Vegetation should recover <br />next growing season. <br />Service hole #3 has not yet been drilled. The pad for this hole has been bulldozed and topsoil has been salvaged in <br />a windrow along one site of the pad. A mud pit has been constructed and the location for the drill hole has been <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 2 of 6