My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-17_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-11-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:29 PM
Creation date
11/19/2010 7:21:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/17/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Week of 10/31/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec'9 <br />D) Geomembrane Acceptance <br />1) VLF <br />Primary 80mil geomembrane (P-121 thru P-231, P-233, P-235 thru P-236, P-270 thru P-281, <br />P288 thru P-292, P-294 thru P-295, and P-297 thru P-319) shown on Figure 4 was inspected by <br />AMEC and Lonestar representatives and found to be installed within project specifications and <br />acceptable for continued construction activities. <br />E) Geomembrane Delivery <br />1) VLF <br />No geomembrane was delivered to site during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC inspected and approved subgrade prior to SLF placement. <br />AMEC observed SLF placement. <br />AMEC inspected and approved subgrade prior to geomembrane deployment. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed and inspected anchor trench excavationlbackfill. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF process area. <br />AMEC continuously monitored the DCF placement. <br />AMEC observed the installation of the high volume solution collection system. <br />AMEC observed loading ore at the Phase 5 PSSA during day and night shift. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture-Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />VLF Weekly Report WE 11.06.10.
The URL can be used to link to this page
Your browser does not support the video tag.