Laserfiche WebLink
o° 1 <br />x <br />A54+00 <br />A56koo ?s?X `, <br />..r?k00 P f?/' '' <br />O <br />c? <br />O <br />O <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL. FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />r --1- PREVIOUSLY DEPLOYED LINER <br />DEPLOYED LINER <br />MOTES: <br />APPROXIMATELY 229,047 SQUARE FEET OF PRIMARY 80 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />APPROXIMATELY 3,998,289 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />CD <br />O <br />O <br />f 7 <br />N <br />I <br /> O <br /> O <br /> C <br /> <br /> <br /> cum CRIPPLE CREEK & VICTOR <br /> GOLD MINING COMPANY <br /> <br />O° PRM <br />? PHASE 5 VLF <br /> <br />et 00 TIRE <br /> o PHASE 5 GEOMEMBRANE INSTALLATION <br /> "' PSSA PRIMARY 80 MIL <br /> <br />0 <br />O DESIGNED BY CMT CNECKED BY JON DATE <br />O O DRAWN BY CUT APPROVED BY JON 11/08/10 <br /> 0J <br />EARTH AND ENVIRONMENTAL <br />cAOO vacNAM[ <br />rxtullE ta. <br />REv <br /> "' - 3 0