Laserfiche WebLink
<br />Table No.1 <br />R.M. Hiner Construction Co., Inc. <br />Greeley Pit (M-1977-151) <br />Water Balance <br />Notes: <br />(A) Depletions from original SWSP request <br />(B) Monthly Lagging Factors obtained from AWAS tool <br />(C) Lagged Depletions = (Depletions) x (B) <br />(D) Graham Ditch Company horse during period May through October. Due to location, no transit loss assesed <br />assesed <br />(E) Platte River Power Authority lease during the period November through March. Due to location, transit losses are <br />(F) Platte River lease Credit = (C) • (1- Platte River Lease Transit Loss) <br />(6) Net Affect to Rover = (e) + (D) - (A). Month of April not included because this month has already passed. <br />Date Revised: 8/3/2010 <br />AG Job #- 08-127 <br />N:\09131 Rex Hiner-Greeley Pit SWSP\Disciplines (Technical)\WRPM\Water Rights\SWSP\2010 SWSP\Response to DWR Review\Greeley Pit 2010 SWSP v2.xlsx <br />4? Appleate <br />Growp, ?. <br />River Transit loss = 0.25% per mile <br />Platte River lease Transit Distance = 26.6 miles <br />Platte River Lease Transit loss = 6.65%