My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-16_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2010-11-16_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:57 PM
Creation date
11/17/2010 2:03:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
11/16/2010
Doc Name
Proposed Decision & Findings of Compliance for PR12
From
Revise B-Seam Mine/Incorporate Part of Bowie #1 Mine
Permit Index Doc Type
Findings
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Revision No. 31 was approved with Stipulation No. 18 attached. This stipulation required the <br />submittal of a rockfall report and the construction of a rockfall berm above the facilities area before the <br />mine plan change in the west district could be implemented. Stipulation No. 18 was complied with. <br />Stipulation No. 19 was attached to Technical Revision No. 34 and required the submittal of the necessary <br />air emissions permits before the B-2 coal seam portal bench upland conveyor could be used. The air <br />emissions permits were submitted so Stipulation No. 19 was terminated. <br />Stipulation No. 20 was attached to Succession of Operator No. 2 and required the resolution of one AVS <br />issue before the permit could be transferred from Bowie Resources Limited to Bowie Resources LLC. <br />Stipulation No. 20 was terminated. Also attached to Succession of Operator No. 2 was Stipulation No. 21. <br />This stipulation required proof that the BLM coal leases were transferred from Bowie Resources Limited <br />to Bowie Resources LLC. Stipulation No. 21 was complied with. <br />Stipulation No. 22 was attached to Field Minor Revision No. 52 and required a permit text revision to <br />reflect that BRL could use a pump on a temporary basis to dewater pond B. With the submittal of the <br />permit text changes, this stipulation was complied with. The use of the pump for pond B became <br />permanent through Technical Revision No. TR-38. The approval of the relocation of one gob vent <br />borehole through Field Minor Revision No. 61 was contingent on the resolution of Stipulation No. :23. <br />This stipulation was complied with when the permit text, map and reclamation cost estimate were <br />submitted. <br />Stipulation No. 24 was attached to Technical Revision No. 45 and required the submittal of permits from <br />CDOT and the Bureau of Reclamation before the elevated conveyor to gob pile no. 3 could be <br />constructed. However, in TR-49 BRL received approval to use a haul road instead of constructing the <br />elevated conveyor. Therefore, when TR-49 became final, Stipulation No. 24 was terminated and was <br />replaced with Stipulation No. 26. This stipulation is still active and requires the submittal and approval of <br />the necessary CDPHE permits before coal waste can be transported to gob pile no. 3. <br />Field Minor Revision No. 84 had Stipulation No. 25 attached to it. This stipulation required the submittal <br />of revised permit pages and maps describing the topsoil storage project. With the submittal of these <br />materials, Stipulation No. 25 was complied with on November 27, 2007. <br />In Technical Revision No. 64, BRL received approval to increase the height of gob pile no. 4. However, <br />Stipulation No. 27 limits the total volume of material stored at gob pile no. 4 until the appropriate <br />construction permit is revised. This stipulation is still active. <br />Originally, lease modification FCL-D-036955 was part of PR-12. However, the lease modification was <br />taken out of PR-12 since the modification is still pending. Stipulation No. 28 was added to the proposed <br />decision for PR-12 so that mining in the lease modification area would not be permitted until appropriate <br />approvals from the Bureau of Land Management and the Division were secured. <br />The following are the active stipulations: <br />Stipulation No. 10 <br />Prior to affecting USDA-Forest Service (FS) water rights by mining, the Operator will submit to the <br />Division for approval, a technical revision that includes 1) a revised Map 23, "Water Rights Location" <br />and revised text that describe the FS water rights within the permit and adjacent area, and 2) verification
The URL can be used to link to this page
Your browser does not support the video tag.