My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-16_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2010-11-16_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:57 PM
Creation date
11/17/2010 2:03:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
11/16/2010
Doc Name
Proposed Decision & Findings of Compliance for PR12
From
Revise B-Seam Mine/Incorporate Part of Bowie #1 Mine
Permit Index Doc Type
Findings
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and seed mix no. 7 is for reclamation of the pasture areas. Seed mix no. 8 was presented and approved in <br />TR-46, in consultation with the Colorado Division of Wildlife, to satisfy Stipulation No. 14 concerning <br />the establishment of shrub clumps in place of having a woody plant density standard for the disturbed <br />areas at the mine site. <br />Hydrologic and subsidence monitoring will occur throughout the operational and reclamation phases of <br />the Bowie No. 2 Mine project. While deleterious hydrologic or subsidence-related impacts are not <br />anticipated, the Bowie No. 2 Mine permit application contains mitigation plans to be implemented if <br />negative impacts are detected. <br />When BRL submitted Permit Revision No. 10, the proposed mine plan extended northward in the vicinity <br />of the Bruce Park Dam and Terror Creek Reservoir. The Division required an extensive seismic, <br />subsidence and hydrologic review and monitoring program for the approval of PR-10. These reports and <br />monitoring requirements were updated so that they applied to the revised mine plan approved in PR-11. <br />However, mining in accordance with the new mine plan to the north had to be curtailed due to difficult <br />mining conditions. Therefore, PR-12 was submitted to revise the permit to include the curtailment of <br />mining to the north and the incorporation of an expanded permit area and associated mine plan to the <br />west. <br />22
The URL can be used to link to this page
Your browser does not support the video tag.