My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-16_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2010-11-16_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:57 PM
Creation date
11/17/2010 2:03:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
11/16/2010
Doc Name
Proposed Decision & Findings of Compliance for PR12
From
Revise B-Seam Mine/Incorporate Part of Bowie #1 Mine
Permit Index Doc Type
Findings
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division sent its final adequacy letter to BRL on May 7, 2003. The Division included the <br />reclamation cost estimate in the amount of $370,186.00 for the activities proposed in Permit Revision No. <br />7. BRL responded on May 12, 2003. All outstanding issues were resolved. <br />The application for Permit Revision No. 8, dated February 27, 2003, was submitted by BRL on February <br />28, 2003. In this revision, BRL proposed the initial five year B-2 coal seam mine plan within fee coal and <br />Federal Coal Lease COC 61209. The permit revision was called complete on March 10, 2003 and letters <br />of completeness were mailed to the appropriate agencies and organizations. The completeness public <br />notice was published four times in the Delta County Independent, in the March 12, 19, 26 and April 2, <br />2003 editions. <br />BRL responded to the Division's adequacy review letter of April 10, 2003 in a submittal dated July 22, <br />2003. All but two of the Division's concerns were answered satisfactorily to the Division in BRL's <br />responses. The Division sent a second adequacy review letter, dated September 15, 2003. BRL replied <br />with their second response letter, dated September 17, 2003. All of the Division's concerns were resolved <br />with that second response letter from BRL. <br />The Division received one comment letter for Permit Revision No. 8. In a letter dated April 21, 2003, the <br />United States Department of Agriculture-Forest Service (USDA-FS) expressed concerns about the effects <br />of subsidence in the Sheep Corral drainage. BRL responded to the concerns of the USDA-FS in the <br />adequacy review response letter dated July 22, 2003. In a reply letter dated September 24, 2003, the <br />USDA-FS concurred with the approval of PR-08, provided that a commitment was added concerning <br />visual subsidence monitoring in the Sheep Corral drainage. In a final submittal dated September 24, 2003, <br />BRL added the commitment to the permit text. <br />In Technical Revision No. 27, BRL proposed to construct a coal preparation wash plant with associated <br />structures. The submittal was received June 19, 2003 and approved with Stipulation No. 15 attached on <br />August 22, 2003. Stipulation No. 15 was complied with upon the submittal of the necessary air emissions <br />permits. <br />A second coal waste disposal site was proposed in Technical Revision No. 30, received on November 13, <br />2003. The capacity of the disposal site was to be about 2 million cubic yards of material and included <br />pond F in the sediment control system. The revision was approved with conditions on March 23, 2004. <br />Stipulation 17 was attached to the approval and was complied with upon the submittal of the updated <br />NPDES permit, air emissions permits, successful resolution of the Section 7 consultation with the USDA- <br />FS and an agreement document with the Deer Trail Ditch Company. <br />Technical Revision No. 31 was submitted on November 24, 2003 in order to slightly modify the mine <br />plans for the D seam and the B seam. Also included in the revision were two incidental boundary <br />changes, an increase of 49.3 acres for the mine plan changes and a decrease of 0.7 acres near the loadout. <br />Modification No. 1 of Federal Coal Lease COC 61209 was necessary to accommodate the mine plan <br />changes. The technical revision was approved with Stipulation No. 18 attached on May 11, 2004. <br />Longwall mining in two panels in the west district was contingent on the submittal of a rockfall report <br />and the construction of a rockfall protective berm above the facilities area. With the submittal of the <br />report and the construction of the berm through Technical Revision No. 35, stipulation 18 was complied <br />with. <br />In a submittal dated December 30, 2003, BRL requested a Succession of Operator, SO-02, to transfer the <br />Bowie No. 2 Mine permit from Bowie Resources Limited to Bowie Resources LLC. The proposed <br />decision to approve with conditions SO-02 was made on September 28, 2004. Stipulations Nos. 21 and 22 <br />were attached to the proposed decision and have been subsequently satisfied. <br />10
The URL can be used to link to this page
Your browser does not support the video tag.