Laserfiche WebLink
f f <br />NEW ELK COAL <br />COMPANY <br />41- <br />Ron Thompson <br />New Elk Coal Company, LLC <br />122 West First Street <br />Trinidad, CO 80182 <br />November 11, 2010 <br />pQC%() <br />NQV 1Q1.4 <br />l Li ORg and Ste) <br />Mr. Kent Gorham <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: New Elk Mine (Permit No. C-1981-012) <br />Technical Revision No. 54 (MR- 54) <br />Site Facilities <br />Dear Mr. Gorham: <br />This letter is submitted in response to the adequacy letter of Technical Revision 54 <br />dated September 24, 2010. <br />DRMS Request 1. Rule 2.05.3(3)(a) requires "A description, plans, and <br />drawings, describing the location, construction, modification, use, maintenance and <br />removal of mine support facilities in the permit area including all buildings, <br />structures, utility corridors and other support facilities including but not limited to <br />those listed in 4.04. Plans and drawings shall include a map, to meet the standards <br />prescribed in 2.10, appropriate cross sections, design drawings, and specifications <br />sufficient to demonstrate compliance with 4.04." Please ensure that the <br />dimensions of the facility are clearly stated with reference to supporting calculations <br />regarding the reclamation costs estimate. Please submit the required <br />information as permit text narrative for all structures proposed to be added <br />under this revision. <br />122 W. First Street PHONE (719) 845-0090 <br />Trinidad, CO 81082 FAX ((719) 845-0077 <br />E-MAIL ronthompson@newelkcoal.com