My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-10_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2010-11-10_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:15 PM
Creation date
11/16/2010 8:16:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
11/10/2010
Doc Name
Preliminary Review
From
DRMS
To
Climax Molybdenum
Type & Sequence
AM6
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 10 <br />EXHIBIT C - Pre-mining and Mining Plan Map(s) of Affected Lands (Rule 6.4.3): One or more maps may be <br />necessary to legibly portray the following information: <br />(a) all immediately adjacent surface owners of record; Please state if the area identified as "private" <br />shown in Section 22 on Figure. C-1 (near Kokomo) is located within 200 feet of the affected <br />area. If so, please identify the owner of this area. Also please identify the owner(s) of the <br />Clinton Reservoir. <br />(b) the name and location of all creeks, roads, buildings, oil and gas wells and lines, and power and <br />communication lines on the area of affected land and within two hundred (200) feet of all <br />boundaries of such area; Missing or incomplete - Please address <br />(c) the existing topography of the area with contour lines of sufficient detail to portray the direction and <br />rate of slope of the affected land; Adequate as submitted <br />(d) the total area to be involved in the operation, including the area to be mined and the area of affected <br />lands (see definition of "Affected Land"); Adequate as submitted <br />(e) the type of present vegetation covering the affected lands; Adequate as submitted in Exhibit J <br />(f) in conjunction with Exhibit G - Water Information, Subsection 6.4.7, if required by the Office, <br />further water resources information will be presented on a map in this section. Adequate as <br />submitted in Exhibit G <br />(g) Show the owner's name, type of structures, and location of all permanent or man-made structures <br />contained on the area of affected land and within two hundred (200) feet of the affected land. <br />Missing - Please address <br />(h) In conjunction with Exhibit I - Soils Information, Subsection 6.4.9, soils information may be <br />presented on a map in this section; Adequate as submitted in Exhibit I <br />(i) Aerial photos, if available, may be included in this section. <br />EXHIBIT D - Mining Plan (Rule 6.4.4): The mining plan shall supply the following information, correlated with <br />the affected lands, map(s) and timetables: <br />(a) description of the method(s) of mining to be employed in each stage of the operation as related to <br />any surface disturbance on affected lands; Adequate as submitted <br />(b) earthmoving; Adequate as submitted <br />(c) all water diversions and impoundments; Adequate as submitted and <br />(d) the size of area(s) to be worked at any one time. Adequate as submitted <br />(e) An approximate timetable to describe the mining operation. The timetable is for the purpose of <br />establishing the relationship between mining and reclamation during the different phases of a <br />mining operation. You will not be required to meet specific dates for initiation, or completion of <br />mining in a phase as may be identified in the timetable. This does not exempt you from complying <br />with the performance standards of Section 3.1. Such timetable should include: <br />(i) <br />(ii) <br />an estimate of the periods of time which will be required for the various stages or phases of <br />the operation; <br />a description of the size and location of each area to be worked during each phase; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.