My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-12_REVISION - M2009076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009076
>
2010-11-12_REVISION - M2009076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:49 PM
Creation date
11/16/2010 8:15:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009076
IBM Index Class Name
Revision
Doc Date
11/12/2010
Doc Name
Technical Revision to Application/Adequacy Review Response.
From
Venture Resources, Inc.
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix to Exhibit C <br />L Sampling and Lab analysis of proposed waste stream, solids and liquids <br />2. Current lab analysis of Big 5 Tunnel Discharge, for establishment of baseline data <br />3. Explanation of Significant Differences Big Five Tunnel Discharge <br />4. USGS Bulletin 1208, Plate 3, Geologic Section Along the Big Five Tunnel, Idaho Springs District, <br />Colorado <br />5. US EPA Record of Decision, ROD R08-88/019,1988 <br />6. CO DMG "Reclamation Feasibility Report - Virginia Canyon", December 2001 <br />7. FEMA Flood Plain Map (Map #08019C00931) effective March 19, 2007) <br />8. Well Map Locations, CO Division of Water Resources <br />9. CSM Edgar Mine Well Log <br />10. Wildeman's Water Handbook for Metal Mining <br />It. Serfilco Model 432 pH Monitor/Recorder submittal <br />12. MSDS data for proposed chemicals to be used in milling operations <br />13. CO WCQD Stormwater Management Plan <br />14. PLACE HOLDER [Contract, Temporary Substitution grater Plan] <br />15. Eaton Metals Diesel Tank, 500 gallon, skid-mounted, double walled <br />16. TRI/Enviromnental Geoteclmical Report and Liner Interface Tests <br />17. Advanced Terra Testing Consolidated Undrained Triaxial Shear Tests and Consolidation Tests <br />18. Composite Liner Submittal <br />19. Synteen Technical Fabrics Geogrid Stabiltiy Analysis Package <br />20. Synteen Technical Fabrics Geogrid specifications <br />21. USGS Peak Ground Acceleration Map, 2% in 50 year return period <br />Page 35 of 37
The URL can be used to link to this page
Your browser does not support the video tag.